Search Header Logo

"Construction I" Buildings SUBJECT : FORMWORK 2 (UNIT 12)

Authored by Mateusz Skiba

English

9th - 12th Grade

CCSS covered

Used 1+ times

"Construction I" Buildings SUBJECT : FORMWORK 2 (UNIT 12)
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

12 questions

Show all answers

1.

FILL IN THE BLANK QUESTION

1 min • 1 pt

Przetłumacz na język polski "FORMWORK"

(a)  

Tags

CCSS.RI.9-10.4

CCSS.RI.9-10.4

CCSS.RI.11-12.4

CCSS.RI.7.4

CCSS.RI.8.4

2.

FILL IN THE BLANK QUESTION

1 min • 1 pt

Przetłumacz na język polski "FOOTING FORMS"

(a)  

Tags

CCSS.RI.9-10.4

CCSS.RI.9-10.4

CCSS.RI.11-12.4

CCSS.RI.7.4

CCSS.RI.8.4

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of formwork is used most often?

wooden formwork

modular formwork

stay-in-place formwork

permanent insulated formwork

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following in not part of a wall form?

braces

sheathing

tie-spreader unit

concrete column

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What to wales do in a wall form?

hold the concrete

make the framework

maintain form spacing

keep the studs in position

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

made from prefabricated plastic forms that remain after the concrete has cured

sheathing

line

wale

stay-in-place

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

to cover the bottom or sides of something with a thin material

line

foothing form

wale

sheathing

Tags

CCSS.RF.3.3B

CCSS.RF.3.3C

CCSS.RF.3.3D

CCSS.RF.4.3A

CCSS.RF.5.3A

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?