
"Construction I" Buildings SUBJECT : FORMWORK 2 (UNIT 12)
Authored by Mateusz Skiba
English
9th - 12th Grade
CCSS covered
Used 1+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
12 questions
Show all answers
1.
FILL IN THE BLANK QUESTION
1 min • 1 pt
Przetłumacz na język polski "FORMWORK"
(a)
Tags
CCSS.RI.9-10.4
CCSS.RI.9-10.4
CCSS.RI.11-12.4
CCSS.RI.7.4
CCSS.RI.8.4
2.
FILL IN THE BLANK QUESTION
1 min • 1 pt
Przetłumacz na język polski "FOOTING FORMS"
(a)
Tags
CCSS.RI.9-10.4
CCSS.RI.9-10.4
CCSS.RI.11-12.4
CCSS.RI.7.4
CCSS.RI.8.4
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What type of formwork is used most often?
wooden formwork
modular formwork
stay-in-place formwork
permanent insulated formwork
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following in not part of a wall form?
braces
sheathing
tie-spreader unit
concrete column
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What to wales do in a wall form?
hold the concrete
make the framework
maintain form spacing
keep the studs in position
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
made from prefabricated plastic forms that remain after the concrete has cured
sheathing
line
wale
stay-in-place
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
to cover the bottom or sides of something with a thin material
line
foothing form
wale
sheathing
Tags
CCSS.RF.3.3B
CCSS.RF.3.3C
CCSS.RF.3.3D
CCSS.RF.4.3A
CCSS.RF.5.3A
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?