CL-900i Service Training Quiz

CL-900i Service Training Quiz

66 Qs

quiz-placeholder

Similar activities

Transcription and Translation Test Bank

Transcription and Translation Test Bank

9th - 12th Grade

67 Qs

Grammar, Punctuation & Spelling Revision

Grammar, Punctuation & Spelling Revision

KG - University

64 Qs

Ch. 3: Revolutionary Era Test

Ch. 3: Revolutionary Era Test

KG - University

62 Qs

8th Grade Science Chemistry STAAR Review

8th Grade Science Chemistry STAAR Review

8th Grade

66 Qs

U.S. Gov Final Semester 2 2022

U.S. Gov Final Semester 2 2022

KG - University

70 Qs

CL-900i Service Training Quiz

CL-900i Service Training Quiz

Assessment

Quiz

others

Hard

Created by

Hiếu Nguyễn Trung

FREE Resource

AI

Enhance your content

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

66 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

3. There is only one substrate bubble detection sensor
TRUE
FALSE

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

6. During the CL-900i installation, sample barcode and reagent barcode scanning position needn't to be aligned.
TRUE
FALSE

3.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

7. Which options are correct regarding incubation module ?
All positions on incubation module are covered in manipulator movement range.
Above parts can NOT be replaced separately, replace the whole incubation module if temperature control issue was found.
Incubate cuvettes by heating the aluminum incubation block.
Incubating positions are distributed in array of 12*7, beside incubating position, there are 2 fixed positions for optic measurement and waste liquid draining

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

9. How many reagent/sample positions does CL-900i have?
15/50
25/60
20/50
15/60

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

11. How many plltiers are used in the reagent refrigeration module?
1
2
3
4

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

12. All reagent refrigeration cold end and hot end fans have stop detection function.
TRUE
FALSE

7.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

13. Regarding substrate priming, which of the following options are correct?
The substrate priming should be executed under the same software interface of substrate tube cleaning.
After priming, the substrate probe should be installed back to dispersion carousel, the black connector should be tighten again, the plug of substrate waste draining tube should be installed back.
The substrate priming should be executed under interface of "Substrate priming".
After priming, the substrate probe should be installed back to dispersion carousel, the plug of substrate waste draining tube needn't to be installed back.

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?