PERFORMANCE CHECK APP NOVEMBER 2023

PERFORMANCE CHECK APP NOVEMBER 2023

Professional Development

45 Qs

quiz-placeholder

Similar activities

ATC Duty Priority

ATC Duty Priority

Professional Development

45 Qs

RAPIDS Series 17: Red Force Recce I

RAPIDS Series 17: Red Force Recce I

Professional Development

50 Qs

PCATC APS20 NOV

PCATC APS20 NOV

Professional Development

50 Qs

NTMA D Before Mapping Teknik

NTMA D Before Mapping Teknik

Professional Development

50 Qs

Block 1 ATC Test

Block 1 ATC Test

Professional Development

49 Qs

UTS1 MBU 25112022

UTS1 MBU 25112022

Professional Development

50 Qs

Performance Check ATC Mopah

Performance Check ATC Mopah

Professional Development

50 Qs

PERFORMANCE CHECK APP NOVEMBER 2023

PERFORMANCE CHECK APP NOVEMBER 2023

Assessment

Quiz

Specialty

Professional Development

Easy

Created by

riri aviyanti

Used 4+ times

FREE Resource

45 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

10 mins • 1 pt

  According KP 166, maximum control hour for air traffic controller per week is

 

6 hours

32 hours

8 hours

24 hours

2.

MULTIPLE CHOICE QUESTION

10 mins • 1 pt

In longitudinal separation based on DME aircraft climbing and decending flying on reciprocal tracks maybe cleared to cross the level of other aircraft at least

Passed each other

Passed each orher and 5 NM apart


Passed each other and 10 NM apart

Passed each other and 3 NM apart

3.

MULTIPLE CHOICE QUESTION

10 mins • 1 pt

  What is general terminology of a path between waypoint:

A turn

A course

A leg

A track

4.

MULTIPLE CHOICE QUESTION

10 mins • 1 pt

An alternate aerodrome at which an aircraft can land should this become necessary shortly after take-off and it is not possible to use the aerodrome of departure

take off alternate

alternate aerodrome

point of destination

aerodrome of departure

5.

MULTIPLE CHOICE QUESTION

10 mins • 1 pt

Controller states a pilots distance of 25 NM as

Twenty Five nautical miles

Two five miles

Twenty five miles

Two five nautical miles

6.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

Below are PBN performance requirement, except

Availability

Accuracy

Continuity

Stability

7.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

   A waypoint demanding turn anticipation requiring the aircraft to start turning before it actually reaches the waypoint is called

Fly-by

Fly-pass

Flyover

Fly-away

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?