1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is it important for projects to serve the general community?

To exclude specific groups

To ensure exclusivity

To promote inclusivity and community benefits

To limit community involvement

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What information is not necessary for the 1st stage application submission?

Landowner's consent (e.g. HDB if the project is on common property) or Temporary Occupation License (TOL)

Project title

Location of the project

Estimated total project cost and requested funding

Declaration on whether projects are affected by existing upgrading programmes

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

For construction of shelter over ramp/ staircase, what project category should be applied during the 2nd stage CIPC application?

Ramps (including railings)

External staircase (including railings)

Others

Linkways of standard heights

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be avoided for joint site verification?

Ensure that the project adheres to the contractual terms outlined in the Form of Tender and tender drawings

Conduct an internal site verification to validate the completed works and ensure correct quantities

Assign staff who are unfamiliar to attend the joint site verification

All of the above

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which is the correct unit of measurement for the facilities?

Linkway (metre run), Playground (m2)

Linkway (m2), Playground (per no.)

Linkway (metre run), Ramp (m2)

Linkway (m2), Ramp (m2)

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are the essential items to bring along during the joint site inspection?

Form of Tender

Variation Order

Tender Drawings

Measuring Equipment

All of the above

7.

FILL IN THE BLANK QUESTION

30 sec • 1 pt

What is the minimum number of working days needed to inform the CIP Team about discrepancies and the rescheduling of the joint site verification?

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?