E. Test your Wits!

E. Test your Wits!

University

8 Qs

quiz-placeholder

Similar activities

Friday Test, 3/7

Friday Test, 3/7

4th Grade - University

10 Qs

Module 1_Town Planning

Module 1_Town Planning

University

11 Qs

S3 PWW - (Message Board) Mortise

S3 PWW - (Message Board) Mortise

11th Grade - University

7 Qs

Architectural drawing basics

Architectural drawing basics

University

10 Qs

Demolition Works

Demolition Works

University

8 Qs

SITE VISIT QUIZ

SITE VISIT QUIZ

University

10 Qs

4) Building Economics and certificates

4) Building Economics and certificates

University

10 Qs

Construction Drawings 15

Construction Drawings 15

9th Grade - University

10 Qs

E. Test your Wits!

E. Test your Wits!

Assessment

Quiz

Architecture

University

Hard

Created by

Macy Kwek

Used 4+ times

FREE Resource

8 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is it important for projects to serve the general community?

To exclude specific groups

To ensure exclusivity

To promote inclusivity and community benefits

To limit community involvement

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What information is not necessary for the 1st stage application submission?

Landowner's consent (e.g. HDB if the project is on common property) or Temporary Occupation License (TOL)

Project title

Location of the project

Estimated total project cost and requested funding

Declaration on whether projects are affected by existing upgrading programmes

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

For construction of shelter over ramp/ staircase, what project category should be applied during the 2nd stage CIPC application?

Ramps (including railings)

External staircase (including railings)

Others

Linkways of standard heights

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be avoided for joint site verification?

Ensure that the project adheres to the contractual terms outlined in the Form of Tender and tender drawings

Conduct an internal site verification to validate the completed works and ensure correct quantities

Assign staff who are unfamiliar to attend the joint site verification

All of the above

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which is the correct unit of measurement for the facilities?

Linkway (metre run), Playground (m2)

Linkway (m2), Playground (per no.)

Linkway (metre run), Ramp (m2)

Linkway (m2), Ramp (m2)

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are the essential items to bring along during the joint site inspection?

Form of Tender

Variation Order

Tender Drawings

Measuring Equipment

All of the above

7.

FILL IN THE BLANK QUESTION

30 sec • 1 pt

What is the minimum number of working days needed to inform the CIP Team about discrepancies and the rescheduling of the joint site verification?

8.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

What are the potential consequences if discrepancies or errors are discovered during the joint site verification exercise?

Adversely affect claim reimbursement

Affect CCCs/ TCs performance under Performance Assessment Framework

All of the above