Hot Water Systems Decommissioning Quiz L3P2U6,2.1

Hot Water Systems Decommissioning Quiz L3P2U6,2.1

Professional Development

9 Qs

quiz-placeholder

Similar activities

Level 3

Level 3

Professional Development

10 Qs

black holes

black holes

KG - Professional Development

12 Qs

Acrylic Nail Course Beginner Quiz

Acrylic Nail Course Beginner Quiz

KG - Professional Development

12 Qs

Info Sharing & Quiz (4/4) - Circular Economy & E-waste

Info Sharing & Quiz (4/4) - Circular Economy & E-waste

Professional Development

10 Qs

Supply_PKT-2_September'23

Supply_PKT-2_September'23

Professional Development

10 Qs

Health and safety

Health and safety

Professional Development

10 Qs

Hot water quick quiz

Hot water quick quiz

Professional Development

11 Qs

fundamentals of nursing-BMW

fundamentals of nursing-BMW

Professional Development

11 Qs

Hot Water Systems Decommissioning Quiz L3P2U6,2.1

Hot Water Systems Decommissioning Quiz L3P2U6,2.1

Assessment

Quiz

Other

Professional Development

Hard

Created by

Craig Boothright

FREE Resource

9 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of permanent decommissioning of a hot water system?

To completely remove the system

To temporarily shut down the system

To extend the system

To repair the system

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done to avoid water stagnation during permanent decommissioning?

Drain the system to a suitable location

Remove all pipework and fittings

Cap off the internal stop tap

Turn off the cold water supply

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When is temporary decommissioning of a hot water system conducted?

When the system is being permanently removed

When the system is being extended

When the system is being serviced or repaired

When the system is no longer required

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done before the decommissioning process starts?

Apply warning notices and signs

Isolate the fuel/electricity supply

Notify the relevant person

Isolate the water supply

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done if there are other trades on site that require water to work?

Ignore their water requirements

Ask them to use water from a different source

Continue with the decommissioning process as planned

Notify them in advance to make alternative water arrangements

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done to isolate the hot water supply during temporary decommissioning?

Isolate the cold water supply

Isolate the electricity supply

Isolate the whole property

Isolate the section of pipework being worked on

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done with the system water during temporary decommissioning?

Dispose of it in the top water drain

Dispose of it on the road

Dispose of it on the property pathway

Dispose of it down the foul water drain

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done if there is no drain point for the system water?

Dispose of the water in the hot water storage cylinder

Dispose of the water in the cold water feed cistern

Dispose of the water in the lowest draw-off point

Install a drain point for future use

9.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done with the pipework sections left drained for a period of time?

Leave them open for ventilation

Cap them off to prevent dirt and vermin/insects ingress

Remove them completely from the system

Replace them with new pipework sections