Fire Hydrant and Fire Hose Reel Installation

Fire Hydrant and Fire Hose Reel Installation

Professional Development

24 Qs

quiz-placeholder

Similar activities

Fire Sciences (Part 1)

Fire Sciences (Part 1)

Professional Development

25 Qs

Safety

Safety

Professional Development

20 Qs

Cerdas Cermat Fire Fighting

Cerdas Cermat Fire Fighting

Professional Development

25 Qs

Causes of fire and Fire emergency procedures

Causes of fire and Fire emergency procedures

Professional Development

24 Qs

Product Refresher - ReAssure

Product Refresher - ReAssure

Professional Development

20 Qs

Install home fire sprinkler systems

Install home fire sprinkler systems

Professional Development

22 Qs

WSF Warrior - Final

WSF Warrior - Final

Professional Development

20 Qs

Operate Explosive Powered Tools

Operate Explosive Powered Tools

Professional Development

25 Qs

Fire Hydrant and Fire Hose Reel Installation

Fire Hydrant and Fire Hose Reel Installation

Assessment

Quiz

Professional Development

Professional Development

Medium

Created by

jason withani

Used 6+ times

FREE Resource

24 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of a feed hydrant?

To supply the pump on the fire truck with water

To dispense water to feed hydrant younglings

The firefighter connects directly to this hydrant to extinguish the fire

To pump the fire on hose boost and hydrant a with feed truck water

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of the attack hydrant?

To supply the pump on the fire truck

The firefighter connects directly to this hydrant to extinguish the fire

The firefighter connects directly to this hydrant to extinguish the fire hose

To protect the firefighters. The hydrant uses personal attacks.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the minimum size pipe supplying two hydrants?

100mm

10mm

100m

80mm

4.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

What is the minimum & maximum height of a fire hydrant?

750-1200mm

1400-2400mm

1100-1400mm

1mm-1000m

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the minimum clearance from the valve handle and the wall?

100mm

1m

150mm

2x onions

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What angle must hydrant outlets be facing?

35 degrees from horizontal

Kurt

Is it smoko?

60 degrees from horizontal

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of the booster assembly?

Where all boosters gather in a hall while at booster school

To allow the fire brigade to connect to the fire service and boost the pressure from the pump on the appliance

To connect hoses

To allow the fire brigade to connect to the fire service and boost the pressure from the plump on the cluck

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?