MIE 10-17-23

MIE 10-17-23

10 Qs

quiz-placeholder

Similar activities

Managing inventories

Managing inventories

University - Professional Development

11 Qs

वचन

वचन

3rd - 7th Grade

11 Qs

OA

OA

University

10 Qs

Kuis kelompok bermain

Kuis kelompok bermain

University

10 Qs

KS3 - FUN QUIZ TERM 2

KS3 - FUN QUIZ TERM 2

5th - 8th Grade

12 Qs

Sandwiches

Sandwiches

10th Grade

10 Qs

Clash Of Clans

Clash Of Clans

1st - 10th Grade

11 Qs

Chemistry Review - Properties of Water

Chemistry Review - Properties of Water

4th - 6th Grade

15 Qs

MIE 10-17-23

MIE 10-17-23

Assessment

Quiz

Other

Medium

Created by

Michelle Evans

Used 1+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Work Zone Traffic Control systems should be designed with a focus on safety for:

General Contractor

Motoring Public, Workers and Pedestrians

Traffic Control Commissioner

Department of Transportation

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is an area called that is typically marked by signs, channelizing devices, barriers, pavement markings, and/or work vehicles that extends from the first warning sign to the END ROAD WORK sign or the last TTC device?

End Zone

Work Zone

Advanced Warning Area

Temporary Caution Area

3.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

The Temporary Traffic Control (TTC) selected for each situation depends on...

type of highway

road user conditions

duration of operation

physical constraints

the nearness of the work space or incident management activity to road users

4.

LABELLING QUESTION

1 min • 1 pt

Most TTC zones are divided into four areas:

b
c
d
e

Activity Area

Termination Area

TTC Area

Advanced Warning Area

Transition Area

5.

MATCH QUESTION

1 min • 1 pt

Match the following

Freeway Lane Closures

WZ(BRK)-13

Shoulder Work for Freeways & Expressways

TCP (5)-18

Work Zone

"Give us a break" signs

BC-21

Barricade and Construction

WZ(RCD)-13

Work Zone Road Closure Details

TCP (6)-12

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of barricade would normally be used for channelization on expressways, freeways, and other HIGH-SPEED roadways?

Type I

Type II

Type III

Temporary Traffic Barrier

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which statement is NOT correct when Portable Changeable Message Signs (PCMS) are used in a temporary traffic control zone?

PCMS are used to provide notice of ramp or lane closures.

PCMS are used where adverse environmental conditions exist.

PCMS are used when speed is expected to drop substantially.

PCMS are used to replace required signing.

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?