MIE 10-17-23

MIE 10-17-23

10 Qs

quiz-placeholder

Similar activities

GKA2043 Quiz 1

GKA2043 Quiz 1

University

10 Qs

SCS-Day 2019 Quiz Contest

SCS-Day 2019 Quiz Contest

Professional Development

15 Qs

Session 3

Session 3

University

13 Qs

Harry Potter

Harry Potter

1st - 3rd Grade

15 Qs

Chayamana Quiz Competition

Chayamana Quiz Competition

1st Grade - University

15 Qs

Projects and Programs Management #3

Projects and Programs Management #3

University - Professional Development

10 Qs

Soal Latihan Pengelolaan Bisnis Ritel XII Bag 2

Soal Latihan Pengelolaan Bisnis Ritel XII Bag 2

3rd Grade

15 Qs

Latihan Globalisasi

Latihan Globalisasi

12th Grade

15 Qs

MIE 10-17-23

MIE 10-17-23

Assessment

Quiz

Other

Practice Problem

Medium

Created by

Michelle Evans

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Work Zone Traffic Control systems should be designed with a focus on safety for:

General Contractor

Motoring Public, Workers and Pedestrians

Traffic Control Commissioner

Department of Transportation

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is an area called that is typically marked by signs, channelizing devices, barriers, pavement markings, and/or work vehicles that extends from the first warning sign to the END ROAD WORK sign or the last TTC device?

End Zone

Work Zone

Advanced Warning Area

Temporary Caution Area

3.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

The Temporary Traffic Control (TTC) selected for each situation depends on...

type of highway

road user conditions

duration of operation

physical constraints

the nearness of the work space or incident management activity to road users

4.

LABELLING QUESTION

1 min • 1 pt

Most TTC zones are divided into four areas:

b
c
d
e

Advanced Warning Area

TTC Area

Transition Area

Activity Area

Termination Area

5.

MATCH QUESTION

1 min • 1 pt

Match the following

Shoulder Work for Freeways & Expressways

TCP (5)-18

Work Zone

"Give us a break" signs

WZ(RCD)-13

Work Zone Road Closure Details

WZ(BRK)-13

Barricade and Construction

BC-21

Freeway Lane Closures

TCP (6)-12

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of barricade would normally be used for channelization on expressways, freeways, and other HIGH-SPEED roadways?

Type I

Type II

Type III

Temporary Traffic Barrier

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which statement is NOT correct when Portable Changeable Message Signs (PCMS) are used in a temporary traffic control zone?

PCMS are used to provide notice of ramp or lane closures.

PCMS are used where adverse environmental conditions exist.

PCMS are used when speed is expected to drop substantially.

PCMS are used to replace required signing.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?