Ag Mech Construction & Carpentry Review
Authored by Molly Feezor
Construction
12th Grade
Used 1+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
20 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When setting up a tripod and a builder's level, the leveling screws should be adjusted until the:
A bubble is centered.
B. leveling rod is level.
C. plumb bob hits the ground.
D. tripod is level.
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A hidden line that indicates the presence of unseen edges is shown on a drawing by a:
A heavy solid line.
B. series of dashes.
C. solid line with arrows.
D. solid zigzag line.
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
If Matthew needs to use a blueprint view that shows the building as if it were cut in two to see the wall parts, he should look at the:
A elevation views.
B. floor plan.
C. scale.
D. sectional view.
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Where on a blueprint should one look to see what the symbols mean?
A elevation
B. legend
C. revision block
D. title block
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Why is an isometric drawing used in construction plans?
A to include electrical plans
B. to include floor plans
C. to show the aerial view of the structure
D. to show the structure as a whole
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When are mechanical drawings used in construction plans?
A after the structure is built
B. if a detailed description is needed
C. if a general description is needed
D. when they are affordable
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What nail is used for fastening tongue-and-groove and finish work?
A box
B. common
C. cut
D. roofing
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?