Search Header Logo

Chapter 9 : Metal Stud Installation (PPMF)

Authored by David Leon

Other

Professional Development

Used 2+ times

Chapter 9 : Metal Stud Installation (PPMF)
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Stud and drywall placement must originate from the same end of any wall, with the open side of all but the originating end stud facing the start point.

True

False

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Most 90° corners are framed with two studs: a corner stud and a(n) ______ stud.

Slap

Cripple

Backing

Drywall

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

An obtuse angle is an angle that is less than 90°.

True

False

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The hard side of the stud should always face the start of layout.

True

False

5.

FILL IN THE BLANKS QUESTION

1 min • 1 pt

A(n) (a)   corner is framed with three studs and can be used in an exterior structural wall or shear wall.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When using aviation snips to cut metal studs, it is important to avoid using any pushing force when making the final cut.

True

False

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

______ provide(s) additional support for attaching finish fixtures such as handicap grab bars, cabinets, or mirrors.

Drywall

Cripples

Backing

Slap studs

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?