
Chapter 9 : Metal Stud Installation (PPMF)
Authored by David Leon
Other
Professional Development
Used 2+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
20 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Stud and drywall placement must originate from the same end of any wall, with the open side of all but the originating end stud facing the start point.
True
False
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Most 90° corners are framed with two studs: a corner stud and a(n) ______ stud.
Slap
Cripple
Backing
Drywall
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
An obtuse angle is an angle that is less than 90°.
True
False
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The hard side of the stud should always face the start of layout.
True
False
5.
FILL IN THE BLANKS QUESTION
1 min • 1 pt
A(n) (a) corner is framed with three studs and can be used in an exterior structural wall or shear wall.
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When using aviation snips to cut metal studs, it is important to avoid using any pushing force when making the final cut.
True
False
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
______ provide(s) additional support for attaching finish fixtures such as handicap grab bars, cabinets, or mirrors.
Drywall
Cripples
Backing
Slap studs
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?