Search Header Logo

RCOA 101

Authored by Auds Beldia

Specialty

University

Used 4+ times

RCOA 101
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

11 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

What is the minimum average peak demand to qualify for contestability?

499 kW

500 kW

749 kW

1 MW

2.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

What is the legal basis of RCOA?

Renewable Energy Act

Department of Energy Act of 1992

Electric Power Industry Reform Act

None of the above

3.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

When did RCOA commence in the Philippines?

2001

2006

2012

2013

4.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

How long is the validity of a RES License?

5 years

10 years

1 year

3 years

5.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

A billing system whereby a Contestable Customer receives separate bills from its RES, WESM (if

applicable) and from its DU.

Single-Billing

Combined-Billing

Dual-Billing

Unbundled-Billing

6.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

All are Local RES, except:

MPower

MGen

VECO Res

Cogent Energy

7.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

The following events trigger Last Resort supply, except:

Increase of peak demand

RES License revoked by ERC

RES ceased to operate

Terminated DWSA between RES and DU

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?