TGM, ITP's and carpentry fitout

TGM, ITP's and carpentry fitout

University

12 Qs

quiz-placeholder

Similar activities

Trivia!  (March 31)

Trivia! (March 31)

University

10 Qs

SolidWorks

SolidWorks

12th Grade - University

10 Qs

[H7063F-IPD1] Mid-Term Review

[H7063F-IPD1] Mid-Term Review

University

17 Qs

3.1 Conceptual Modelling

3.1 Conceptual Modelling

11th Grade - University

10 Qs

System Development Life Cycle (SDLC)

System Development Life Cycle (SDLC)

10th Grade - Professional Development

10 Qs

stair

stair

University

11 Qs

HTML forms

HTML forms

11th Grade - University

10 Qs

Quiz 2 (Wastewater Characteristics)

Quiz 2 (Wastewater Characteristics)

University

14 Qs

TGM, ITP's and carpentry fitout

TGM, ITP's and carpentry fitout

Assessment

Quiz

Design

University

Medium

Created by

Douglas Thomas

Used 4+ times

FREE Resource

12 questions

Show all answers

1.

MULTIPLE SELECT QUESTION

30 sec • 3 pts

Which of the following are pertinent in the TQM Circle of continuous improvement ?

Checking

taking action

planning

doing

2.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Why is continuous improvement relevant to the construction industry ?

Different projects on different sites require adapting and constant review of processes

Continually innovating sector

All of these

A large group of people involved in the process.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following stakeholders shouldnt be considered in the TQM process of a construction company.

Consultants

Suppliers

Subcontractors

Site staff

None of these

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is responsible for the PDCA cycle

W.E Demming

K.Ishikawa

Joseph Juran

Philip Crosby

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is not critical in an ITP.

Stakeholder meetings

Design accuracy

Safety

Accountability for process

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following shouldn't be included in an ITP ?

Design review

Safety considerations

Consultant specifications

Codes and standards

Specifications of onsite workers coffee preference.

7.

MULTIPLE SELECT QUESTION

45 sec • 2 pts

Which of the following should be included in an ITP ?

Material supply and quality checks

Inspection points

Sign offs

Requests for time extensions

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?