Prestressed Concrete HW 1b

Prestressed Concrete HW 1b

Professional Development

10 Qs

quiz-placeholder

Similar activities

6035 | Drainage systems | LO1.1

6035 | Drainage systems | LO1.1

Professional Development

13 Qs

Operate Scissor Lift

Operate Scissor Lift

Professional Development

10 Qs

6035 | Central Heating LO1 Part 1

6035 | Central Heating LO1 Part 1

Professional Development

10 Qs

B)Prestressed Concrete HW(IBC-318)

B)Prestressed Concrete HW(IBC-318)

Professional Development

11 Qs

A)Prestressed Concrete HW(IBC-318)

A)Prestressed Concrete HW(IBC-318)

Professional Development

10 Qs

L2 Plumbing Common Plumbing Processes Knowledge Test

L2 Plumbing Common Plumbing Processes Knowledge Test

University - Professional Development

14 Qs

Cold Water Systems LO2

Cold Water Systems LO2

Professional Development

13 Qs

Prestressed Quiz 1c

Prestressed Quiz 1c

Professional Development

8 Qs

Prestressed Concrete HW 1b

Prestressed Concrete HW 1b

Assessment

Quiz

Professional Development

Professional Development

Easy

Created by

Piledriverob Piledriverob2375

Used 14+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Do not start any transition curvature in a Tendon closer than_____ from the stressing Anchorage.

12 INCHES

6 inches

12 inches plus 1

Answer explanation

FIELD MANAUL fig. 4-4

SPECIFICATIONS 3.7.5.3

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Beam Tendons should be supported at a maximum spacing of ?

48 INCHES

24"

13"

Answer explanation

FIELD MANUAL 4.5.2

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Couplers should only be used at locations approved by the _________.

LDP

License

Design

Professional

supervisor

foreman

Answer explanation

FIELD MANUAL 9.10.3

SPECIFICATIONS 2.4.3

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Extension cords for stressing equipment at a minimum should be three-wire, 12 gauge & less than ______ in length

100 FEET

50'

1000'

Answer explanation

FIELD MANULA 6.3.(g)

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Proper concrete consolidation is most critical at the ___________.

ANCHORAGE ZONE

midspan

entire pour

Answer explanation

FIELD MANUAL 5.1.3

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A minimum clear distance of ______ should be maintained between PT Tendons & blocked out openings.

3 INCHES

6 inches plus 1

12 inches

Answer explanation

FIELD MANUAL 4.4.19

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Tape used as a component for sheathing repairs shall have a minimum width of _____.

2 INCHES

1-1/2 inches

6 inches

Answer explanation

SPECIFICATIONS 2.4.3.2

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?