103W2B

103W2B

Professional Development

40 Qs

quiz-placeholder

Similar activities

CONTABILIDAD DE SEGUROS

CONTABILIDAD DE SEGUROS

Professional Development

40 Qs

CONTABILIDAD BANCARIA

CONTABILIDAD BANCARIA

Professional Development

38 Qs

đề Pháp Luật 1

đề Pháp Luật 1

Professional Development

39 Qs

PM PC 1250

PM PC 1250

Professional Development

43 Qs

KIẾN THỨC AN TOÀN THỰC PHẨM

KIẾN THỨC AN TOÀN THỰC PHẨM

Professional Development

40 Qs

conocimientos de mecanica automotriz basica 1

conocimientos de mecanica automotriz basica 1

Professional Development

35 Qs

PRODUCT TRAINING D155A-6

PRODUCT TRAINING D155A-6

Professional Development

40 Qs

Ekosistem

Ekosistem

Professional Development

45 Qs

103W2B

103W2B

Assessment

Quiz

Specialty

Professional Development

Hard

Created by

Rizwan Rizwan

Used 1+ times

FREE Resource

40 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

What is the initial basis for testing information?
A) Historical performance data
B) Manufacturer's specifications
C) Equipment maintenance records
D) Testing standards and regulations

2.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

How can testing specifications and data be used beyond initial testing?
A) To determine maintenance schedules
B) To compare against historical performance
C) To set new industry standards
D) To design new equipment

3.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

What method is commonly used for carrying out soundness tests and certification?
A) Electrical testing
B) Hydrostatic/pneumatic methods
C) Magnetic resonance imaging (MRI)
D) Visual inspections

4.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

What document provides instructions for safe use and highlights potential hazards associated with materials, products, or processes?
A) Maintenance/Inspection documents
B) Safety work sheet (SWS)
C) Material safety data sheet (MSDS)
D) Inspection Data Records (IDR)

5.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

What does ITP stand for in the context of engineering work?
A) Internal Testing Protocol
B) Inspection and Test Plan
C) In-Service Testing Procedure
D) Internal Technical Procedure

6.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

In which stages of engineering work are Inspection and Test Plans (ITPs) used?
A) Only during the construction phase
B) During manufacture, construction, and operation phases
C) Only during the operation phase
D) During maintenance and repair phases

7.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

What is the main purpose of an Inspection Method Statement?
A) To provide historical performance data
B) To outline the hazards involved in an inspection
C) To capture comments and results from readings
D) To describe the company's organizational structure

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?