Search Header Logo

QUIZ 2

Authored by June 2022 Architect

Architecture

Used 30+ times

QUIZ 2
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

In applying plumbing permit, the registered and licensed Master Plumber shall fill out the forms provided the details required by the OBO.

Which of the following is not included under this subsection:

Describe the land upon which the proposed plumbing work is to be done, legal description, street address or similar description that will readily identify and locate the proposed building or work.

Identify and describe the plumbing work to be covered by the permit for which an application is made.

Specify the validity of the permit, the workloads and construction validity.

Be accompanied by plans, drawings, diagrams, computations, technical specifications, and other data as required in Subsection 102.2

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many sets of plumbing plans, drawings, diagrams, design analyses and computations shall be submitted as requirements for application of plumbing permit?

4 sets

6 sets

5 sets

8 sets

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Every request for inspection shall be filed at least ____ days before such inspection is intended.

6 days

4 days

2 days

3 days

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who should test all the plumbing systems and ensure that it is in lined with the Plumbing Code?

Administrative Authority

Owner with the Master Plumber

Journeyman

Registered and Licensed Master Plumber

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The seal of a licensed master plumber shall include written on the choices except:

Registered and Licensed Master Plumber

    at lower portion of the round seal.

The registration number shall appear at the center below the name.

Philippines appearing at the lower portion of the round seal.

Registered and Licensed Master Plumber

    at upper portion of the round seal.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Section 102 of the code pertains to what?

Application for Existing Plumbing System

Inspections

Permit Issuance

Application for permit

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Usage and operation of any plumbing accessory that is installed to replace existing equipment or fixtures shall not be prohibited given that the reinspection request has been files for not more than ___ hours after the replacement work is completed.

62 hours

42 hours

72 hours

52 hours

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?