CPS QUIZZIZ

CPS QUIZZIZ

University

15 Qs

quiz-placeholder

Similar activities

Risk Management - Group 2 Quiz

Risk Management - Group 2 Quiz

University

10 Qs

CB Chapter 4

CB Chapter 4

University

18 Qs

Organizational Behavior Chapter 1

Organizational Behavior Chapter 1

University

20 Qs

BA314 W4

BA314 W4

University

15 Qs

Sinh hoạt chủ điểm quý 1/2022

Sinh hoạt chủ điểm quý 1/2022

University

10 Qs

WHO_Int.Org_2024A

WHO_Int.Org_2024A

University

10 Qs

Đánh giá chất lượng dịch vụ du lịch

Đánh giá chất lượng dịch vụ du lịch

University

10 Qs

Pharm 105 Quiz: Organizing

Pharm 105 Quiz: Organizing

University

20 Qs

CPS QUIZZIZ

CPS QUIZZIZ

Assessment

Quiz

Other

University

Hard

Created by

SOUNDAR RAJAN M

Used 1+ times

FREE Resource

AI

Enhance your content

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

If to, tp and tm are the optimistic, pessimistic and most likely time estimates of an activity respectively, the expected time t of the activity will be

to+3tm+tp/2

to+3tm+tp/3

to+4tm+tp/5

to+4tm+tp/6

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

A construction schedule is prepared after collecting

Number of operations

Output of labour

Output of machinery

All the above

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Bar charts are suitable for

Minor works

Major works

Large projects

All the Above

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The Overall in-charge of an organization at the site responsible for the execution of the works, is

Executive Engineer

Engineer

Junior Engineer

Assistant Engineer

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The main principle of an organization, is

Unity of command

Effective control at all levels

Delegation of authority

All the above

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

A dummy activity

Is artificially introduced

Is represented by a dotted line

Does not consume time

All the above

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Critical path lies along the activities having total float

Positive

Negative

Zero

Same

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?