Introduction to SE (Part 2)

Introduction to SE (Part 2)

University

10 Qs

quiz-placeholder

Similar activities

PELATIHAN L&T

PELATIHAN L&T

University

12 Qs

Teknologi Pendidikan

Teknologi Pendidikan

University

10 Qs

Inovação

Inovação

University

11 Qs

Global, Comparative and International Education

Global, Comparative and International Education

University

11 Qs

Latihan_4_PAI_6_Desain Perencanaan&Penilaian Pembelajaran

Latihan_4_PAI_6_Desain Perencanaan&Penilaian Pembelajaran

University

10 Qs

Gambar Teknik Manufaktur

Gambar Teknik Manufaktur

1st Grade - Professional Development

10 Qs

Simulacro 1 2023 II

Simulacro 1 2023 II

University

15 Qs

Basic on Operating System

Basic on Operating System

University

10 Qs

Introduction to SE (Part 2)

Introduction to SE (Part 2)

Assessment

Quiz

Education

University

Practice Problem

Hard

Created by

fairose mohtar

Used 18+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A software process model represents which one of the following?

The way in which software is developed

The way in which software is used

The way in which software processes data

The way in which software may fail

2.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

What are the fundamental software Engineering activities? [More than one answer]

Software specification

Software validation

Software design and implementation

Software evolution

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If requirements are easily understandable and defined, which model is best suited?

Waterfall Model

Prototyping Model

RUP model

Agile Scrum

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If requirements are frequently changing, which model is to be selected?

Waterfall Model

Prototyping Model

Agile Scrum Model

Incremental development model

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Agile model advocates which one of the following approaches?

In each increment, get something “quick and dirty” delivered and thereby save time

In each increment, get something of business-value delivered as quickly as possible, consistent with the right level of quality

In each increment, get something simple released as quickly as possible

In each increment, get something delivered once it has been fully documented and the documentation has been signed off as complete

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Agile Software Development Process is:

Sequential

Incremental

Iterative

Iterative & Incremental

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who prioritizes product backlog?

Product owner

Scrum master

Scrum team

Client

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?