Wind Project Life Cycle

Wind Project Life Cycle

University

11 Qs

quiz-placeholder

Similar activities

DCT Gearboxes

DCT Gearboxes

12th Grade - Professional Development

6 Qs

Quiz sur le Couvreur

Quiz sur le Couvreur

3rd Grade - University

10 Qs

T03 SEP

T03 SEP

University

10 Qs

Week 7 Autotronics 1 DTA2174

Week 7 Autotronics 1 DTA2174

University

7 Qs

Geração Hidrelétrica - Turbinas

Geração Hidrelétrica - Turbinas

University

11 Qs

QUIZ BIDER#13

QUIZ BIDER#13

University

16 Qs

Rotors and turbines

Rotors and turbines

9th Grade - Professional Development

8 Qs

AVCORE 3109

AVCORE 3109

University

10 Qs

Wind Project Life Cycle

Wind Project Life Cycle

Assessment

Quiz

Professional Development

University

Medium

Created by

Sivakumar V

Used 2+ times

FREE Resource

11 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A wind farm has a lifespan of ___ - ____ years that starts with development and goes through construction, operation and ends with decommissioning or occasionally repowering

10-20

20-30

30-40

40-50

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Repowering means....

replacing old WPPs with newer ones

Commissioning a new power plant

Discarding a old power plant

Servicing a power plant

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Site feasibility study, Permissions and Procurement, Installation and Commissioning of WPP's consuming

less than 3 months

3 - 6 months

6 - 9 months

9 - 12 months

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

•A ___MW turbine requires a crane with capacity to lift ___ tons for hoisting the tower sections nacelle and rotor into position.

2 MW, 500 tons

1 MW, 500 tons

2 MW, 600 tons

1 MW, 600 tons

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The top of the turbine structure of WPP

Nacelle

rotor

the generator, gearbox, control systems

nacelle and the rotor assembly

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Rotor assembly consists of

blades and hub

the generator, gearbox, control systems,

the generator, and gearbox

the generator, gearbox, blades,

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

SCADA system means

Superior Control and Data Acquisition

Surplus Control and Data Acquisition

Supervisory Control and Data Assessment

Supervisory Control and Data Acquisition

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?