I&C

I&C

Professional Development

15 Qs

quiz-placeholder

Similar activities

Unity 3D Interface Basics

Unity 3D Interface Basics

Professional Development

10 Qs

O5 Order Taking Day 4

O5 Order Taking Day 4

Professional Development

15 Qs

Bahaya Listrik

Bahaya Listrik

Professional Development

10 Qs

Hot Water Solution

Hot Water Solution

Professional Development

20 Qs

AAT Level 2 Bookkeeping Transactions

AAT Level 2 Bookkeeping Transactions

Professional Development

20 Qs

Confirmation of Learning 3

Confirmation of Learning 3

Professional Development

20 Qs

Tagline Quiz

Tagline Quiz

Professional Development

20 Qs

promoting products quiz

promoting products quiz

Professional Development

12 Qs

I&C

I&C

Assessment

Quiz

Other

Professional Development

Hard

Created by

Rajendra kale

Used 2+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

 

1.      What is the purpose of testing gas-insulated switchgear (GIS)?

a) To ensure proper installation and commissioning

b) To assess the insulation condition

c) To verify the mechanical endurance

d) All of the above

2.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

What is the primary function of an under voltage relay?

A) To monitor and detect overvoltage conditions in electrical systems.

b) To control the frequency of an electrical signal

c) To protect equipment and circuits from low voltage conditions.

d) To regulate the current flow in a power distribution network

3.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

What is the purpose of a hydrostatic stretch test?

A) To measure the volume capacity of a pressure vessel.

B) To assess the mechanical integrity and strength of a pressure vessel

c) To determine the corrosion resistance of a pressure vessel

d) To evaluate the thermal conductivity of a pressure vessel

4.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Media Image

This setting tool used for_

a) Adjustment of tie rod

b) Setting of bus-duct contact

c) adjustment of expansion joint

a) Adjustment of tie rod

Answer explanation

Media Image

5.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Media Image

What does a shock indicator with a rating of 25g indicate?

a) The magnitude of electrical current in a circuit

b) The level of shock resistance in a material

c) The sensitivity to impact or acceleration events

d) The weight or mass of an object.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the tightening torque of DN8 connection Density monitor ?

a) 20 Nm

b) 40 Nm

c) 60 Nm

d) 35 Nm

7.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

When a person electrically touches the live part of an apparatus, the step potential is_

a) potential between the hand and the

leg

b) none of the given options

c) The potential between the two legs of

a person when he walks on an electrically operated surface

d) potential between the hand and the

other hand

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?