Mostly cooling...

Mostly cooling...

University

10 Qs

quiz-placeholder

Similar activities

DCIT Week 1 Quiz

DCIT Week 1 Quiz

University

10 Qs

Facility Layout Type

Facility Layout Type

University

13 Qs

PLANE TABLE SURVEYING

PLANE TABLE SURVEYING

University

15 Qs

Materials science

Materials science

University

15 Qs

Guess the anime

Guess the anime

KG - Professional Development

6 Qs

Ant science

Ant science

5th Grade - University

11 Qs

Drug For Anti-Hypertension

Drug For Anti-Hypertension

University

11 Qs

BAWOD

BAWOD

12th Grade - University

15 Qs

Mostly cooling...

Mostly cooling...

Assessment

Quiz

Other

University

Practice Problem

Medium

Created by

Timothy Robinson

Used 29+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which component in a vapor cycle air conditioning system is responsible for changing the liquid refrigerant into a gas and cause cooling of the airflow over the component ?

13

The evaporator.

The condenser.

The compressor.

The expansion chamber.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which component of a vapor cycle air conditioning system is responsible for filtering the liquid refrigerant ( after the condenser) and removing moisture ?

12

The condenser.

The receiver-dryer.

The evaporator.

The thermal expansion valve.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the status of the vapour cycle system if bubbles are seen in the receiver-dryer sight glass?

11

The system is operating normally.

There is an incomplete condensation and the system is low on refrigerant.

There is incomplete evaporation and the system is low on refrigerant.

There is an air leak in the receiver-dryer.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In an air cycle air conditioning system, in which component does the first reduction in bleed air temperature occur ?

12

The primary heat exchanger.

The secondary heat exchanger.

The expansion turbine.

The air cycle machine.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In an air cycle air conditioning system, which component is responsible for the greatest drop in temperature of the bleed air that is used for cabin cooling ?

20

The primary heat exchanger.

The secondary heat exchanger.

The expansion turbine.

The air cycle machine.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the source of electrical power for the emergency lights on an aircraft?

Main DC voltage bus.

Essential AC voltage bus.

Dedicated battery packs.

Aircraft battery.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To check the serviceability of an escape slide during a daily or pre-flight check is

To ensure that the girt bar is attached

The bustle is bolted to the housing

To check the charge on the slide pressure gauge is in the green band

To check that the slide arm handle is free to move and the red pin has flag installed

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?