Year 9 Unit 18 Graphs

Year 9 Unit 18 Graphs

7th Grade

9 Qs

quiz-placeholder

Similar activities

BAB 4: Nisbah dan Kadar

BAB 4: Nisbah dan Kadar

7th - 8th Grade

10 Qs

EVALUACIÓN FINAL DE MATEMÁTICA

EVALUACIÓN FINAL DE MATEMÁTICA

7th Grade

10 Qs

Rasyonel sayılar Quiz

Rasyonel sayılar Quiz

7th Grade

11 Qs

Nombres de números de 4 a 7 cifras

Nombres de números de 4 a 7 cifras

6th - 7th Grade

10 Qs

Poliedros - 4S

Poliedros - 4S

6th - 12th Grade

14 Qs

PTS MATEMATIKA KELAS 7

PTS MATEMATIKA KELAS 7

7th Grade

10 Qs

Olimpiadas Matemáticas-Financieras CMRC 2021 Ciclo 6º-7º

Olimpiadas Matemáticas-Financieras CMRC 2021 Ciclo 6º-7º

6th - 7th Grade

10 Qs

Znaky dělitelnosti 2

Znaky dělitelnosti 2

6th - 9th Grade

13 Qs

Year 9 Unit 18 Graphs

Year 9 Unit 18 Graphs

Assessment

Quiz

Mathematics

7th Grade

Practice Problem

Medium

Created by

Simon Smith

Used 2+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

9 questions

Show all answers

1.

FILL IN THE BLANK QUESTION

3 mins • 1 pt

Media Image

Work out the gradient of line a on the graph.

2.

FILL IN THE BLANK QUESTION

3 mins • 1 pt

Find the gradient of a straight line between:

(0, 6) and (6, −6)

3.

FILL IN THE BLANK QUESTION

3 mins • 1 pt

Find the gradient of the line with this equation

2 + 3x = y

4.

FILL IN THE BLANK QUESTION

3 mins • 1 pt

Write formula in the form y = mx + c

3(x − y) = 2

5.

FILL IN THE BLANK QUESTION

3 mins • 1 pt

Find the gradient of this line

x = 2y + 4

6.

MULTIPLE CHOICE QUESTION

3 mins • 2 pts

These are the equations of five straight lines.

A: y + 2x = 5

B: y + 5 = 2x

C: 2y = 7 − 4x

D: 2x + 2y = 5

E: 2x − y = 1

Which lines are parallel?

A and C; B and E

A and D; D and E

A and B; C and D

A, B and E

7.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

Media Image

Use the graph to find solutions to these pair of simultaneous

equations.

y + 20 = 3x and x + 2y = 5

(6.5, -0.7)

(5.5, -3.5)

(4.4, 0.4)

8.

FILL IN THE BLANK QUESTION

3 mins • 1 pt

The cost of hiring a car is $40 plus a charge of $30 per day.

How much will it cost to hire a car for two days?

9.

FILL IN THE BLANK QUESTION

3 mins • 1 pt

The cost of hiring a car is $40 plus a charge of $30 per day.

Find a formula to show the cost (c), in dollars, of hiring a car for (d) days.