Search Header Logo

PMFF quiz ISE marks

Authored by Manjunath Burji

Other

University

Used 4+ times

PMFF quiz ISE marks
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

Profitability depends upon target by the

Loom shed

Winding

Warping

Spinning

2.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

Which technique is used for controlling the machine downtime

Snap study technique

Fish bone

SMED technique

None of the Options

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Need of the process management in weaving is to -------------

Increase the productivity

Improve the fabric quality

Earn more profit

All the options

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Emphasis on winding should be on

Speed

Productivity

End breakage rate

Quality of preparation

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

First objective of winding is to

Built of package

Yarn faults

Good package

Splice joint

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Size pickup in the yarn can be controlled by

Hardness of size roller

Dry splitting

Hairiness of yarn

All the options

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Satisfactory limit of stretch percentage in sized yarn should not exceed above

0.5

1.0

1.5

2.0

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?