
PMFF quiz ISE marks
Authored by Manjunath Burji
Other
University
Used 4+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
10 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
10 sec • 1 pt
Profitability depends upon target by the
Loom shed
Winding
Warping
Spinning
2.
MULTIPLE CHOICE QUESTION
10 sec • 1 pt
Which technique is used for controlling the machine downtime
Snap study technique
Fish bone
SMED technique
None of the Options
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Need of the process management in weaving is to -------------
Increase the productivity
Improve the fabric quality
Earn more profit
All the options
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Emphasis on winding should be on
Speed
Productivity
End breakage rate
Quality of preparation
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
First objective of winding is to
Built of package
Yarn faults
Good package
Splice joint
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Size pickup in the yarn can be controlled by
Hardness of size roller
Dry splitting
Hairiness of yarn
All the options
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Satisfactory limit of stretch percentage in sized yarn should not exceed above
0.5
1.0
1.5
2.0
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?