MULTIPLE CHOICE QUESTION

30 sec • 1 pt

a line on a drawing measures 125mm. What is the actual measurement if the scale of the drawing is 1:20?

1.25m

2.5m

3.5m

5m

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

elevations are drawn at what scale?

1:10 or 1:50

1:1250 or 1:2500

1:20 or 1:50

1:50 or 1:100

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

which of the following is the most appropriate scale for a cross section drawing of a building?

0.1805555556

0.1458333333

0.1111111111

1:20

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

the main reason that hatchings are used on construction drawings is to:

improve the appearance of the information

identify the materials used in construction

avoid the extra costs from printing in colour

satisfy planning permission

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

what is the term used to show different materials on working drawings?

hatchings

shading

design

images

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

what is the purpose of a drawing?

show sequence of work

show repetitive design information

show the quantity of materials and workmanship

show sizes and layout

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

a method statement is used for what purpose?

assists in making the management responsible for the safety of the work force

assists in ensuring the safety of the workers by making sure that they are properly trained

is used by plant operators to inform them on how to operate a machine

assists in ensuring the safety of workers by itemising all tools, equipment and methods used during a task

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

what is the main purpose of a specification?

it gives information on ranges of fittings needed in a building

it gives information on materials and workmanship required

it is used to outline changes required during the contract

it helps the site manager when producing a programme of work

9.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

how would you pre-condition resilient sheet flooring covering?

loosen the rolls and lay them overnight on the floor of the installation area

unroll the rolls and stand them upright in the installation area

loosen the rolls and stand them upright in the installation area

leave the packaged rollsin the installation area overnight

10.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

timber based floor coverings MUST be fitted with a gap against the wall to allow for:

the door linings

carpet grippers

air to circulate

expansion and contraction

Explore all questions with a free account

or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?