Building Envelope System

Building Envelope System

9th - 12th Grade

15 Qs

quiz-placeholder

Similar activities

PC Pro 7.0 Lesson 8.3 "Remote Services"

PC Pro 7.0 Lesson 8.3 "Remote Services"

12th Grade

11 Qs

Plumbing quiz

Plumbing quiz

9th - 12th Grade

12 Qs

Techno 5° - Les réseaux informatiques

Techno 5° - Les réseaux informatiques

8th - 9th Grade

20 Qs

PKKWU KUIS 1

PKKWU KUIS 1

12th Grade

10 Qs

Fire Detection and Alarm System Installation Quiz

Fire Detection and Alarm System Installation Quiz

10th Grade

10 Qs

Sensoren en opnemers Hst. 4

Sensoren en opnemers Hst. 4

1st - 10th Grade

11 Qs

Technology Vocabulary (EDUC 455)

Technology Vocabulary (EDUC 455)

11th Grade - University

10 Qs

Empowerment Technologies Lesson 2 Quiz

Empowerment Technologies Lesson 2 Quiz

11th Grade

10 Qs

Building Envelope System

Building Envelope System

Assessment

Quiz

Instructional Technology

9th - 12th Grade

Medium

Created by

Reid Chapman

Used 21+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Installing windows and exterior doors in a house is the final step in?

finishing

thermal protection

drying-in

envelope sealing

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

For maximum energy efficiency in a structure, air infiltration is controlled by properly applying and sealing?

building paper

polypropylene film

rigid insulation

building wrap

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When installing building wrap on a structure, all overlaps should be?

3" to 6"

6" to 12"

12" to 18"

18" to 24"

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To meet IRC requirements, the maximum sill height above the floor of an egress window is?

36"

40"

44"

48"

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Nailing flanges are not found on the outside of?

wood windows

metal windows

vinyl-clad wood windows

vinyl windows

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When checking a window opening for squareness, you would use a?

combination square

plumb bob

framing square

laser level

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To allow for settling, the space allowed between the rough header and window head jamb should be?

1/8" to 1/4"

1/4" to 1/2"

5/16" to 5/8"

5/8" to 3/4"

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?

Discover more resources for Instructional Technology