Building Envelope System

Building Envelope System

9th - 12th Grade

15 Qs

quiz-placeholder

Similar activities

PARTES DE LA COMPUTADORA

PARTES DE LA COMPUTADORA

12th Grade - University

15 Qs

PRE-TEST

PRE-TEST

12th Grade

10 Qs

MEDIALIT QUIZ

MEDIALIT QUIZ

12th Grade

16 Qs

11 Construction Bricklaying

11 Construction Bricklaying

11th Grade

10 Qs

GLOSARIO DE TERMINOS

GLOSARIO DE TERMINOS

7th - 11th Grade

20 Qs

EMPOWERMENT TECH WEEK 1

EMPOWERMENT TECH WEEK 1

11th - 12th Grade

10 Qs

sistem pengaman tambahan

sistem pengaman tambahan

12th Grade

10 Qs

Intro to MIL

Intro to MIL

11th Grade

10 Qs

Building Envelope System

Building Envelope System

Assessment

Quiz

Instructional Technology

9th - 12th Grade

Practice Problem

Medium

Created by

Reid Chapman

Used 23+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Installing windows and exterior doors in a house is the final step in?

finishing

thermal protection

drying-in

envelope sealing

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

For maximum energy efficiency in a structure, air infiltration is controlled by properly applying and sealing?

building paper

polypropylene film

rigid insulation

building wrap

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When installing building wrap on a structure, all overlaps should be?

3" to 6"

6" to 12"

12" to 18"

18" to 24"

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To meet IRC requirements, the maximum sill height above the floor of an egress window is?

36"

40"

44"

48"

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Nailing flanges are not found on the outside of?

wood windows

metal windows

vinyl-clad wood windows

vinyl windows

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When checking a window opening for squareness, you would use a?

combination square

plumb bob

framing square

laser level

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To allow for settling, the space allowed between the rough header and window head jamb should be?

1/8" to 1/4"

1/4" to 1/2"

5/16" to 5/8"

5/8" to 3/4"

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?

Discover more resources for Instructional Technology