PEC 5

PEC 5

University

49 Qs

quiz-placeholder

Similar activities

Review Exam Day 2

Review Exam Day 2

University

45 Qs

BAC1054 Final Exam MCQ

BAC1054 Final Exam MCQ

University

50 Qs

MatSci Prelims

MatSci Prelims

University

50 Qs

Tes Wawasan Kebangsaan LPDP 2021

Tes Wawasan Kebangsaan LPDP 2021

University

50 Qs

ORTOPRÓTESIS MIEMBRO SUPERIOR

ORTOPRÓTESIS MIEMBRO SUPERIOR

University

51 Qs

9º ANO - QUIZIZZ EEBA

9º ANO - QUIZIZZ EEBA

8th Grade - University

50 Qs

Ilmu Asas Technical Analysis Saham

Ilmu Asas Technical Analysis Saham

University

50 Qs

TUTORIAL GAIT

TUTORIAL GAIT

University

45 Qs

PEC 5

PEC 5

Assessment

Quiz

Other

University

Practice Problem

Hard

Created by

Lira Ortega

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

49 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Equipment for installation in hazardous locations must be tested and approved for use according to the classification of the hazards involved. These are divided into ______ groups.

4

3

7

6

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Compliance with the provisions of the PEC will result in ______.

I. freedom of hazards

II. good electrical service

III. an efficient system

I, II and III

I and II only

I only

II only

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Auxilliary gutters shall not contain more than ______ current carrying conductors at any cross section.

36

32

30

24

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

IN hazardous locations, the use of non-metallic conduit shall be permitted provided it is buried NOT less than ______ below the earth level.

400 mm

600 mm

1,000 mm

500 mm

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Hazardous locations in which easily ignitable fibers or materials producing combustible flyings are handled, manufactured or used.

Class III, Division 1

Class III, Division 2

Class I, Division 1

Class I, Division 2

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

There are situations where deviations from the code requirements are necessary. Before such deviations are made, there must be a written permission from one of the following entities. Which one is this?

Board of Electrical Engineering

Code of Enforcing Authority

IIEE Code Committee

hilippine Regulation Board

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A point in a wiring system at which current is taken to be used in some equipment.

grounded

conductor

service entrance

outlet

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?