
Setel ulang fasilitas gas
Authored by Arizal Risqi
Professional Development
Professional Development

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
10 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Gas Facility Reset apply for conditions below, except:
Reset after flexible hose depressurization
Reset after pipeline pressurization
Reset after prolong shutdown
Reset after pipeline depressurization
2.
FILL IN THE BLANKS QUESTION
1 min • 1 pt
GT Prolong Shutdown is (a) weeks
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Contact to FRSU operator to conduct as follow:
open ESDV CGR814 FSRU NG Send-Out line and start delivering Natural Gas at minimum capacity of 43.2 MMSCFD
true
false
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Pressurized downstream PLS through 1st, 2nd and 3rd train SSV manual bypass valve.
true
false
5.
FILL IN THE BLANKS QUESTION
1 min • 1 pt
Override PSD-2.0 is only when ORF Pressure (a) bar
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Gas Facility Reset is pressurized the gas line from FSRU until PLS
true
false
7.
MULTIPLE SELECT QUESTION
45 sec • 1 pt
This following valve need to be closed to pressurized downstream SSV, except
Manual Isolation Valve downstream 1st PLS 00EKD01AA015
Manual Isolation Valve downstream 1st PLS 00EKD01AA016
1st Train SSV Manual Bypass Valves 00EKD01AA005
Manual Isolation Valve downstream 2nd PLS 00EKD02AA015
Manual Isolation Valve downstream 3rd PLS 00EKD03AA015
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?