WI Socialization - Part Load Efficiency Heater System

WI Socialization - Part Load Efficiency Heater System

Professional Development

12 Qs

quiz-placeholder

Similar activities

Kesehatan Kerja ( Materi AK3 Umum)

Kesehatan Kerja ( Materi AK3 Umum)

Professional Development

10 Qs

Denny's Berry Series Exam

Denny's Berry Series Exam

Professional Development

13 Qs

POST TEST ADKON

POST TEST ADKON

Professional Development

11 Qs

Cepat Tepat Accurate Online Part 1

Cepat Tepat Accurate Online Part 1

Professional Development

15 Qs

Pre Test ACLS ward 4 A

Pre Test ACLS ward 4 A

Professional Development

10 Qs

Houseman teaching (nephrotic/nephritic)

Houseman teaching (nephrotic/nephritic)

Professional Development

16 Qs

BỆNH XỔ MŨI TRUYỀN NHIỄM - CORYZA và SẢN PHẨM Tuần 1.T5.2024

BỆNH XỔ MŨI TRUYỀN NHIỄM - CORYZA và SẢN PHẨM Tuần 1.T5.2024

Professional Development

11 Qs

PEMANTAPAN IKM SMPN 1 NGANTRU 16 AGUSTUS 2023

PEMANTAPAN IKM SMPN 1 NGANTRU 16 AGUSTUS 2023

Professional Development

10 Qs

WI Socialization - Part Load Efficiency Heater System

WI Socialization - Part Load Efficiency Heater System

Assessment

Quiz

Specialty

Professional Development

Practice Problem

Medium

Created by

AP P

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

12 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

PLE is abbreviation of ...

Plant Load Efficiency

Part Load Energize

Plant Load Energize

Part Load Efficiency

2.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Following the work instruction, what are the hazard(s) if we want to operate this system?

Heat

Falling down

Pressurized water

Slippery

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How much setpoint of flow for PLE Heater?

96.5 m3/h

97 m3/h

97.25 m3/h

97.5 m3/h

4.

MULTIPLE CHOICE QUESTION

1 min • 3 pts

What is the right steps to start up PLE system?

1. Ensure related operator open PLE heater drain manual valve HV132 until water come out, then close it

2. Ensure no system fault on the system

3. PLE heating will start heating automatically (TCV hot water will open and control) when the GT PLE Heater permissive is fulfilled

4. Ensure BOP water filling permissive has been fulfilled

5. Select “ENABLE” button on HMI

6. PLE automatically command “PLE heater filling” (PLE heater will start to fill automatically; TCV cold water will open and control)

7. Ensure PLE heater running in normal condition

2 - 4 - 5 - 6 - 1 - 3 - 7

4 - 5 - 6 - 1 - 3 - 2 - 7

4 - 2 - 5 - 6 - 1 - 3 - 7

2 - 4 - 5 - 1 - 3 - 6 - 7

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

What is the pop up/display that shows on the picture?

GT PLE Start Up Permissive

GT PLE Heater Filling Permissive

GT PLE Heater Heating Permissive

GT PLE Shutdown Permissive

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When PLE heater filling, it will be filled by cold water.

True

False

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

What is the pop up/display that shows on the picture?

GT PLE Start Up Permissive

GT PLE Heater Filling Permissive

GT PLE Heater Heating Permissive

GT PLE Shutdown Permissive

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?