1.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Basement can minimise the floor space available in a building without using extra land

True

False

2.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Belows are the common risks during basement construction EXCEPT:

obstruction of existing services

reduction in the risk of damaging ground movement

boundary issues

poor ground conditions

3.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

Deep basement can be constructed using traditional ways such as cut and fill (open cut method) or top down method.

True

False

4.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

Open cut arrangement is a simplest and most straightforward method of arrangement.

True

False

5.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

If the work of excavation is beyond ______ deep, it is uneconomical for open cut method.

4m

8m

6m

5m

6.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

The main disadvantage of open cut method is the large amount of free site space required to construct the slope.

True

False

7.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

Diaphragm Wall, Contiguous Bored Pile Wall and ________ are the example of permanent retaining wall.

soldier pile

secant pile wall

laffing walls

sheet pile

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?

Discover more resources for Education