ISTQB Question Bank 221 to 260

ISTQB Question Bank 221 to 260

Professional Development

40 Qs

quiz-placeholder

Similar activities

ISTQB Foundation 9

ISTQB Foundation 9

Professional Development

40 Qs

ISTQB FOUNDATION 1

ISTQB FOUNDATION 1

Professional Development

40 Qs

ISTQB Foundation 10

ISTQB Foundation 10

Professional Development

40 Qs

ISTQB Question Bank 741 to 780

ISTQB Question Bank 741 to 780

Professional Development

40 Qs

ISTQB Question Bank 1021 to 1060

ISTQB Question Bank 1021 to 1060

Professional Development

40 Qs

Quality_control

Quality_control

Professional Development

36 Qs

ISTQB Question Bank 501 to 540

ISTQB Question Bank 501 to 540

Professional Development

40 Qs

ISTQB Question Bank 461 to 500

ISTQB Question Bank 461 to 500

Professional Development

40 Qs

ISTQB Question Bank 221 to 260

ISTQB Question Bank 221 to 260

Assessment

Quiz

Science

Professional Development

Medium

Created by

Hiếu Bồ

Used 8+ times

FREE Resource

40 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Testing should be stopped when:
All the planned tests have been run
Time has run out
All faults have been fixed correctly
Both "All the planned tests have been run" and "All faults have been fixed correctly"
I depends on the risks for the system being tested

2.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Which  test  technique  is  based  on  requirements  specifications?
White-box  technique
Component  testing
Black-box  technique
Data  driven  testing

3.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Which of the following is NOT part of configuration management:
Status accounting of configuration items
Auditing conformance to ISO9001
Identification of test versions
Record of changes to documentation over time
controlled library access

4.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

A test plan defines
What is selected for testing
Objectives and results
Expected results
Targets and misses

5.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

A tool that supports traceability, recording of incidents or scheduling of tests is called:
A dynamic analysis tool
A test execution tool
A debugging tool
A test management tool
A configuration management tool

6.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

The cost of fixing a fault:
Is not important
Increases as we move the product towards live use
Decreases as we move the product towards live use
Is more expensive if found in requirements than functional design
Can never be determined

7.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Order numbers on a stock control system can range between 10000 and 99999 inclusive. Which of the following inputs might be a result of designing tests for only valid equivalence classes and valid boundaries:
1000, 5000, 99999
9999, 50000, 100000
10000, 50000, 99999
10000, 99999
9999, 10000, 50000, 99999, 10000

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports