PEC 2

PEC 2

University

50 Qs

quiz-placeholder

Similar activities

CONTRACTS: CHAPTER I - GENERAL PROVISION

CONTRACTS: CHAPTER I - GENERAL PROVISION

University

48 Qs

OPEN BOOK EXAM 6

OPEN BOOK EXAM 6

University - Professional Development

50 Qs

GEAS 21

GEAS 21

University

50 Qs

Mcqs on Stock market operations

Mcqs on Stock market operations

University - Professional Development

46 Qs

LET Reviewer - General Education (1-50)

LET Reviewer - General Education (1-50)

KG - Professional Development

50 Qs

Journeyman 10 - Nth

Journeyman 10 - Nth

University

50 Qs

FOR PREPARTION

FOR PREPARTION

University

45 Qs

QUIZ ON CHILD LABOUR PROHIBATION

QUIZ ON CHILD LABOUR PROHIBATION

University

50 Qs

PEC 2

PEC 2

Assessment

Quiz

Other

University

Hard

Created by

Lira Ortega

Used 3+ times

FREE Resource

50 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Potential transformers, and other switchboard devices with potential coils shall be supplied by a circuit that is protected by standard overcurrent devices rated ____amperes or less.

15

20

25

30

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The grounded conductor of a mineral-insulated, metal-sheathed cable shall be identified at the time of installation by ______ marking at its termination.

distinctive

neutral

solid

identified

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

An overcurrent trip unit of a circuit shall be connected in series with each _____.

ungrounded conductor

grounded conductor

overcurrent device

transformer

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Any motor application shall be considered as ____ unless the nature of the apparatus it drives is such that the motor will not operate continuously with load any condition of use.

short-time duty

continuous duty

varying duty

periodic duty

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Distances from signs, radio and TV antennas, tanks or other nonbuilding or non-bridge structures, clearances, vertical, diagonal and horizontal, shall not be less than _____ feet.

2

3

6

8

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

It is the intent of the Code that _____ wiring or the construction of equipment need not be inspected at the time of installation of the equipment, if the equipment has been listed by a qualified electrical testing laboratory.

factory-installed internal

underground

factory-installed

raceway

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The following pool equipment shall be grounded ____.

I. ground-fault circuit-interrupters

II. transformer enclosures

III. electric equipment located within 5 feet of the inside wall of the pool

III only

II & III only

II only

I, II & III

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?