MYCESMM2 - CLASS E & F

MYCESMM2 - CLASS E & F

University

14 Qs

quiz-placeholder

Similar activities

Perspectiva Isométrica

Perspectiva Isométrica

University

15 Qs

SITE VISIT QUIZ

SITE VISIT QUIZ

University

10 Qs

Random Construction Questions

Random Construction Questions

11th Grade - University

16 Qs

Steel Connection Design Quiz 6

Steel Connection Design Quiz 6

University

14 Qs

Ancient Rome Architecture

Ancient Rome Architecture

University

16 Qs

Construction Drawings 15

Construction Drawings 15

9th Grade - University

10 Qs

Quiz on Environmental Management 2

Quiz on Environmental Management 2

University

15 Qs

Quiz on Construction Materials and Their Properties

Quiz on Construction Materials and Their Properties

University

15 Qs

MYCESMM2 - CLASS E & F

MYCESMM2 - CLASS E & F

Assessment

Quiz

Architecture

University

Practice Problem

Medium

Created by

DR IDA

Used 6+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

14 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

CLASS E in MYCESSM2 refers to Demolition and Site Clearance.

TRUE

FALSE

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Water bodies shall consist of, but not limited to, rivers, lake and sea, unless expressly required.

This Definition rules refers to ....

E110, D1

E120, D3

E100, D3

E120, D4

3.

DRAG AND DROP QUESTION

1 min • 1 pt

The project site clearance include 20 nos between 2.0 - 3.0 m girth of tree.

Choose the suitable code of MYCESMM2 for this activities. ​ ​

​ ​ (a)  

E230
E210
E220
E240

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The below rules applied to E311 EXCEPT

D5

D6

A5

A7

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

For Code E800, the additional rules applied is

A1

A2

A3

No Additional Rules Applied

6.

DRAG AND DROP QUESTION

1 min • 1 pt

Construction Activities ; Stripping of top soil is under MYCESMM2 Class ​ ​ (a)   ​ (b)  

F
111
E
R
H
110
100

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Excavation to remove Unsuitable Material refers to below EXCEPT

stumps

large amounts of roots and grass

earth

rubbish

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?