1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

CLASS E in MYCESSM2 refers to Demolition and Site Clearance.

TRUE

FALSE

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Water bodies shall consist of, but not limited to, rivers, lake and sea, unless expressly required.

This Definition rules refers to ....

E110, D1

E120, D3

E100, D3

E120, D4

3.

DRAG AND DROP QUESTION

1 min • 1 pt

The project site clearance include 20 nos between 2.0 - 3.0 m girth of tree.

Choose the suitable code of MYCESMM2 for this activities. ​ ​

​ ​ (a)  

E230
E210
E220
E240

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The below rules applied to E311 EXCEPT

D5

D6

A5

A7

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

For Code E800, the additional rules applied is

A1

A2

A3

No Additional Rules Applied

6.

DRAG AND DROP QUESTION

1 min • 1 pt

Construction Activities ; Stripping of top soil is under MYCESMM2 Class ​ ​ (a)   ​ (b)  

F
111
E
R
H
110
100

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Excavation to remove Unsuitable Material refers to below EXCEPT

stumps

large amounts of roots and grass

earth

rubbish

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?