ISTQB Question Bank 621 to 660

ISTQB Question Bank 621 to 660

Professional Development

40 Qs

quiz-placeholder

Similar activities

ISTQB Question Bank 221 to 260

ISTQB Question Bank 221 to 260

Professional Development

40 Qs

ISTQB Foundation 2

ISTQB Foundation 2

Professional Development

40 Qs

ISTQB Question Bank 821 to 860

ISTQB Question Bank 821 to 860

Professional Development

40 Qs

ISTQB Foundation 7

ISTQB Foundation 7

Professional Development

40 Qs

Domestic Gas Legislation Quiz

Domestic Gas Legislation Quiz

Professional Development

42 Qs

Vocabulary 1

Vocabulary 1

Professional Development

40 Qs

AP Psychology - Cognition #2

AP Psychology - Cognition #2

11th Grade - Professional Development

41 Qs

ISTQB Question Bank 181 to 220

ISTQB Question Bank 181 to 220

Professional Development

40 Qs

ISTQB Question Bank 621 to 660

ISTQB Question Bank 621 to 660

Assessment

Quiz

Science

Professional Development

Easy

Created by

Hiếu Bồ

Used 7+ times

FREE Resource

AI

Enhance your content

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

40 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

The test strategy that is informal and non structured is:
Equivalence partitioning
Validation strategy
White box testing
Ad hoc testing

2.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

The test strategy that involves understanding the program logic is:
Equivalence partitioning
White box testing
Black box testing
Boundary strategy

3.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Which of the following details would most likely be included in an incident report?

<br>

I. Identification of the test item (configuration item) and environment.

II. Development process characteristics such as organization stability and test process used.

III. A review of the test basis, such as requirements, architecture, design, interfaces.

IV. Scope or degree of the impact on the stakeholders' interests.

I, II and III.

II and III.

I and IV

III and IV.

4.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

What is the main focus of System Testing?
Communications between the system and other systems.
Ensuring that the system is fit for business purpose.
The defined behavior of the whole system or product.
The defined behavior of the whole system or product.

5.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Which of the following is NOT a test planning activity?
Selecting test conditions based on an analysis of the test object.
Scheduling test analysis and design, implementation and execution activities.
Assigning resources for the activities to be performed.
Making decisions about which roles will perform the test activities and setting the level of detail for the test procedures.

6.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

The programs send bad data to devices, ignore error codes coming back, and try to use devices that are busy or aren’t there. This is a:
Calculation error
Functional error
Hardware error
System error
User Interface error

7.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Which of the following are included as part of static testing (manual and automated)?
Inspections, execution of the software, and walkthroughs.
Inspections, walkthroughs, and comparison of expected to actual results.
Inspection of work products and analysis of software artifacts using tools.
Walkthroughs, simulation, and defect tracking.

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?

Discover more resources for Science