Central Heating 6035-02 | Part 3

Central Heating 6035-02 | Part 3

Professional Development

40 Qs

quiz-placeholder

Similar activities

Sustainability Aircon Theory Revision

Sustainability Aircon Theory Revision

Professional Development

41 Qs

Chapter 5

Chapter 5

Professional Development

42 Qs

Electrical Science Revision Quiz

Electrical Science Revision Quiz

Professional Development

40 Qs

Domestic Hot Water 6035-02 | Part 3

Domestic Hot Water 6035-02 | Part 3

Professional Development

40 Qs

MACHINE TROUBLESHOOTING D155A-6

MACHINE TROUBLESHOOTING D155A-6

Professional Development

35 Qs

Electrical Principles 6035-02 | Part 4

Electrical Principles 6035-02 | Part 4

Professional Development

40 Qs

IFGC & IMC 1

IFGC & IMC 1

Professional Development

40 Qs

Drainage Systems 6035-02 | Part 4

Drainage Systems 6035-02 | Part 4

Professional Development

36 Qs

Central Heating 6035-02 | Part 3

Central Heating 6035-02 | Part 3

Assessment

Quiz

Professional Development

Professional Development

Medium

Created by

George Harding

Used 60+ times

FREE Resource

40 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

At what temperature does the boiler thermostat shut the boiler down at to prevent overheating?

60°C

65°C

75°C

85°C

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What british standard covers the maufacture of radiators?

BS EN 12828

BS 4422

BS EN 14336

BS 6700

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What care needs to be taken when in older properties where horsehair/felt lagging due to?

The insulation may have worn away

The insulation does not comply with Building Regs

The insulation is flammable

The insulation could need replacing

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

What is the component shown here?

Pump flange

Reducing coupling

Female to male cylinder connector

Washing machine valve

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which British Standanrd covers preparation, commissioning and maintenance of domestic heating and cooling water systems?

BS EN 442

BS EN 12828

BS 7593

BS EN 14336

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Under Building Regulations part L, what SEDBUK rating must condensing boilers be to be fitted?

Rated A

Rated B

Rated C

Rated D

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

What is the component shown?

Programmer

Cylinder thermostat

Room thermostat

Thermostatic radiator valve

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?

Discover more resources for Professional Development