LC480 Service Training Day1 Review

LC480 Service Training Day1 Review

Professional Development

10 Qs

quiz-placeholder

Similar activities

Guess the Country! :)

Guess the Country! :)

8th Grade - Professional Development

14 Qs

Education Framework Q1

Education Framework Q1

Professional Development

10 Qs

10-ITEM CONTENT SIR JHOB FB/YT/TIKTOK

10-ITEM CONTENT SIR JHOB FB/YT/TIKTOK

Professional Development

10 Qs

Introduction to Management

Introduction to Management

University - Professional Development

10 Qs

Bringing Language to Life through Technology

Bringing Language to Life through Technology

Professional Development

10 Qs

17 Days of SDGs Quiz - Day 16 (English)

17 Days of SDGs Quiz - Day 16 (English)

3rd Grade - Professional Development

15 Qs

CodeMonkey Platform Management & Resources

CodeMonkey Platform Management & Resources

Professional Development

10 Qs

Administrative Law for Public Authorities - Topic 1

Administrative Law for Public Authorities - Topic 1

University - Professional Development

10 Qs

LC480 Service Training Day1 Review

LC480 Service Training Day1 Review

Assessment

Quiz

Education

Professional Development

Practice Problem

Hard

Created by

John Lu

Used 2+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How should you place the 8-tubes strips inside the strip adapter?

There are no special recommendations

At the center of the adapter

On both sides, so that they are placed symmetrically.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many people are required to install a LightCycler 480 system?

Only 1 person, this is an easy job.

2 persons, as there are many task to be done.

2 persons to lift and place the analyzer, then 1 person is enough.   

1 technician and 1 application specialist are required

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which control unit and operating system is delivered with a new system?

RP5810 with windows 10 preinstalled.

RP5810, windows has to be downloaded and installed manually.

Engage Flex Pro with windows installed.

Engage flex Pro, Windows 10 has to be downloaded and installed manually.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The Exor 4 makes a link between the LightCycler® application software and ...?

a database file         

a virtual port

the service software

an analyzer

5.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Which information is stored inside a database? Select all that apply.

Experiments, macros         

Virtual port number           

Instrument serial number           

User and password                   

6.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

What are the specifics of a traceable database? Choose all that apply.

An audit trail is present.                        

Experiments cannot be deleted.          

Comments are mandatory, when saving or changing data.                

The default passwords must be changed.              

7.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

What functions are available in the service software? Chose all that apply.

Perform system checks and calibrations.                                  

Read counters and system values.                                        

Activate and register the system.

Allows to download the Instrument Control (IC) software.

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?