Common Plumbing Processes: 2

Common Plumbing Processes: 2

Professional Development

11 Qs

quiz-placeholder

Similar activities

Quiz-iz It!

Quiz-iz It!

Professional Development

10 Qs

Quality Control Measures in Asphalt Pavement Construction

Quality Control Measures in Asphalt Pavement Construction

Professional Development

10 Qs

Pertolongan Pertama Pada Kecelakaan (P3K)

Pertolongan Pertama Pada Kecelakaan (P3K)

Professional Development

10 Qs

ARP CGO - Rénovation

ARP CGO - Rénovation

Professional Development

15 Qs

C091 SEAL

C091 SEAL

Professional Development

15 Qs

healthy lifestyle

healthy lifestyle

8th Grade - Professional Development

10 Qs

Le Moteur à Combustion Interne

Le Moteur à Combustion Interne

KG - Professional Development

16 Qs

Chemical Engineering quizz 1

Chemical Engineering quizz 1

Professional Development

10 Qs

Common Plumbing Processes: 2

Common Plumbing Processes: 2

Assessment

Quiz

Other

Professional Development

Medium

Created by

Paul McGarrigle

Used 32+ times

FREE Resource

11 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1.        Which one of the following does not form part of the commissioning process?

a.    Soundness testing

a.    Visual inspection

Flushing the system

a.    Fitting plumbing appliance.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1.        Which one of the following parts of the Building Regulations deals with building structure?

a.    Part A

a.    Part B

Part F

a.    Part L.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1.        What does LCS stand for?

a.    Long Coil Strand

a.    Low Carbon Steel

Low Copper Steel

a.    Loose Cover Sheet.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1.        Which one of the following should be used to protect the area you are working in?

a.    Safety shoes

a.    Plywood

a.    Dust sheets

a.    Heat mat.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1.        Which one of the following is the correct horizontal clipping interval for 15mm copper tube?

a.    1.2m

a.    1.5m

a.    1.8m

a.    2.0m.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1.        At what point should an inhibitor be added to a central heating system during commissioning?

a.    During the first flush

a.    Before flushing

a.    During the final fill of the system

a.    Before cleaning the pipework.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1.        Which one of the following grades of copper is used for microbore central heating pipework?

a.    R220

a.    R250

R290

a.    R300.

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?