Common Plumbing Processes: 2

Common Plumbing Processes: 2

Professional Development

11 Qs

quiz-placeholder

Similar activities

Baby CPR and choking uk

Baby CPR and choking uk

KG - Professional Development

14 Qs

ACRLS Quiz on ECHELON CIRCULAR™ Powered Stapler

ACRLS Quiz on ECHELON CIRCULAR™ Powered Stapler

Professional Development

10 Qs

BASIC ENGINE DIAGNOSIS

BASIC ENGINE DIAGNOSIS

Professional Development

10 Qs

Neck and Back Pain

Neck and Back Pain

Professional Development

15 Qs

Lifeguard Challenge Unconscious Scenarios 2023

Lifeguard Challenge Unconscious Scenarios 2023

10th Grade - Professional Development

15 Qs

Vehicle Air-Conditioning - Quiz

Vehicle Air-Conditioning - Quiz

Professional Development

10 Qs

1.5 GSC reviewer

1.5 GSC reviewer

Professional Development

15 Qs

Automotive stuff

Automotive stuff

5th Grade - Professional Development

11 Qs

Common Plumbing Processes: 2

Common Plumbing Processes: 2

Assessment

Quiz

Other

Professional Development

Medium

Created by

Paul McGarrigle

Used 32+ times

FREE Resource

11 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1.        Which one of the following does not form part of the commissioning process?

a.    Soundness testing

a.    Visual inspection

Flushing the system

a.    Fitting plumbing appliance.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1.        Which one of the following parts of the Building Regulations deals with building structure?

a.    Part A

a.    Part B

Part F

a.    Part L.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1.        What does LCS stand for?

a.    Long Coil Strand

a.    Low Carbon Steel

Low Copper Steel

a.    Loose Cover Sheet.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1.        Which one of the following should be used to protect the area you are working in?

a.    Safety shoes

a.    Plywood

a.    Dust sheets

a.    Heat mat.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1.        Which one of the following is the correct horizontal clipping interval for 15mm copper tube?

a.    1.2m

a.    1.5m

a.    1.8m

a.    2.0m.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1.        At what point should an inhibitor be added to a central heating system during commissioning?

a.    During the first flush

a.    Before flushing

a.    During the final fill of the system

a.    Before cleaning the pipework.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1.        Which one of the following grades of copper is used for microbore central heating pipework?

a.    R220

a.    R250

R290

a.    R300.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?