FTMR

FTMR

Professional Development

22 Qs

quiz-placeholder

Similar activities

Petrochina Quiz

Petrochina Quiz

Professional Development

20 Qs

ENGLISH Proficiency Test (N41)

ENGLISH Proficiency Test (N41)

Professional Development

17 Qs

Design Thinking Check Point

Design Thinking Check Point

Professional Development

20 Qs

Pedagogic Games III

Pedagogic Games III

1st Grade - Professional Development

20 Qs

Infallible Vedas (DYS 2)

Infallible Vedas (DYS 2)

Professional Development

18 Qs

MGNF-14

MGNF-14

Professional Development

20 Qs

LATIHAN UJI KOMPETENSI

LATIHAN UJI KOMPETENSI

Professional Development

20 Qs

20764 - SQL - Mod 5 and 6

20764 - SQL - Mod 5 and 6

Professional Development

18 Qs

FTMR

FTMR

Assessment

Quiz

Professional Development

Professional Development

Practice Problem

Easy

Created by

Jim Lynch

Used 14+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

22 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

(Refer to Figure 1 when answering this question.) A pipe needs to come up in the wall marked *. How far is the center of the wall from column line "C"? 

3 feet and 6 inches.

5 feet and 9 inches.

6 feet and 3 inches. 

19 feet and 3 inches

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How far is it from the center of 

the pipe located in the wall marked* to line D? 

13 feet and 4 inches

13 feet and 6 inches.

35 feet and 9 inches.

40 feet and 9 inches. 

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Using the formula below, what is the correct 45° offset when you have a rolling offset where the roll is 8 inches and the rise is 6 inches?

2 inches

6 inches.

10 inches

14 inches

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

On the project blueprint there is a bank of four pipe runs with each pipe measuring three inches in diameter which measure 12 inches in length on the blueprint. The scale used on the blueprint is 4 inch equals 1 foot. How many feet of 3 inch pipe should be ordered to complete the runs? 

48 feet. 

96 feet. 

144 feet.

192 feet. 

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Convert 170 inches to feet and inches. 

13 feet and 2 inches.

14 feet and 2 inches. 

14 feet and 6 inches. 

17 feet and 0 inches. 

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The piping specifications required all wall penetrations to have a steel pipe sleeve. The steam piping size is 4 inches SCH 80 carbon steel with 11⁄2 inch of fiberglass insulation. What diameter of SCH 40 carbon steel sleeve is the minimum that you can use?

5 inches. 

6 inches.

8 inches

10 inches

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Calculate the number of hangers needed to support 275 feet of pipe if you need a hanger placed every 8 feet? 

31 hangers

32 hangers

33 hangers

35 hangers.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?

Discover more resources for Professional Development