Work Design-Measurement-Batch-Production

Work Design-Measurement-Batch-Production

Professional Development

33 Qs

quiz-placeholder

Similar activities

la chancla

la chancla

Professional Development

29 Qs

Trainman

Trainman

Professional Development

34 Qs

Review 1 8th level

Review 1 8th level

6th Grade - Professional Development

28 Qs

Lean Six Sigma

Lean Six Sigma

Professional Development

28 Qs

PRODUCTION 2

PRODUCTION 2

9th Grade - Professional Development

30 Qs

Squid Games

Squid Games

Professional Development

37 Qs

Team Bonding Session May 2022!

Team Bonding Session May 2022!

Professional Development

28 Qs

fast and furisous   quiz part 2

fast and furisous quiz part 2

KG - Professional Development

29 Qs

Work Design-Measurement-Batch-Production

Work Design-Measurement-Batch-Production

Assessment

Quiz

Fun

Professional Development

Easy

Created by

Khaled .jjbhh

Used 5+ times

FREE Resource

33 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The amount of time that should be allowed for an average worker to process one work unit using the standard method and working at a normal pace

Allowance time

Standard time

Normal time

Average time

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Normal time is calculated after adding an allowance time for the worker

True

False

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Standard time

Is a time taken to preform a work cycle at 100% performance

To account for the rest breaks, an allowance is added to the normal time in order to determine an allowance time for the worker to perform the task through out the shift

Process preformed without the direct participation of a human worker

The extra time figures which are added to the basic time of an operation to account for personal desires

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Normal time

Is a time taken to preform a work cycle at 100% performance

To account for the rest breaks, an allowance is added to the normal time in order to determine an allowance time for the worker to perform the task through out the shift

Process preformed without the direct participation of a human worker

The extra time figures which are added to the basic time of an operation to account for personal desires

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Allowance time

Is a time taken to preform a work cycle at 100% performance

To account for the rest breaks, an allowance is added to the normal time in order to determine an allowance time for the worker to perform the task through out the shift

Process preformed without the direct participation of a human worker

The extra time figures which are added to the basic time of an operation to account for personal desires

6.

FILL IN THE BLANK QUESTION

1 min • 1 pt

Standard time eq

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Manual work system

Process performed without the direct participation of a human worker

Human worker operates provided equipment

Worker performing one or more tasks without the aid of powered tools

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?