Chapter 03 2021 UPC

Chapter 03 2021 UPC

43 Qs

quiz-placeholder

Similar activities

 PERCUBAAN SAINS SELANGOR SET 2 2024

PERCUBAAN SAINS SELANGOR SET 2 2024

KG - University

40 Qs

1. LATIHAN PAS I KELAS 6 PEND. AGAMA ISLAM

1. LATIHAN PAS I KELAS 6 PEND. AGAMA ISLAM

6th Grade

40 Qs

Produk Kreatif dan Kewirausahaan

Produk Kreatif dan Kewirausahaan

12th Grade

40 Qs

Harry Potter and the Sorcerer's Stone Pt. 1 Quiz

Harry Potter and the Sorcerer's Stone Pt. 1 Quiz

5th Grade - University

38 Qs

SOAL SEMESTER GANJIL TAHUN 2023/2024

SOAL SEMESTER GANJIL TAHUN 2023/2024

KG - University

44 Qs

ASSESSMENT ENGLISH X GRADERS

ASSESSMENT ENGLISH X GRADERS

10th Grade

40 Qs

Cold Water Unit Assessment

Cold Water Unit Assessment

KG - University

44 Qs

Plumbing Tools Quiz

Plumbing Tools Quiz

Professional Development

41 Qs

Chapter 03 2021 UPC

Chapter 03 2021 UPC

Assessment

Quiz

others

Easy

Created by

Jeremy Sandor

Used 63+ times

FREE Resource

AI

Enhance your content

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

43 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1. AIl materials, fixtures, or devices used or entering into the construction of plumbing and drainage systems shall be listed as
a. complying with approved applicable standards
b. conforming to green product specifications
c. conforming to price of job
d. conforming to material availability

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

2. All pipe, pipe fittings, traps, fixtures, materials, and devices used in plumbing systems shall be____________________.
a. listed or labeled by a listing agency
b. approved by the Authority Having Jurisdiction
c. free from defects
d. all of the above

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

3. The provisions of the code allow an alternate material or method of construction provided it is ________________________.
a. approved by the architect as an alternate
b. accepted by the owner as an alternate
c. approved by the Authority Having Jurisdiction as an alternate
d. manufactured by a reputable organization

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

4. If an AHJ permits an “alternative engineered design” ______________________
a. the approval shall have effect beyond that AHJ boundary.
b. the approval shall have no effect beyond that AHJ boundary.
c. a property owner shall also approve the change.
d. a covenant shall be recorded to that effect.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

5. The section of the UPC that grants the Authority Having Jurisdiction the opportunity to require tests as proof of equivalency.
a. 301.3.1
b. 301.1.3
c. 311.3
d. 301.1.2

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

6. Plumbing systems shall be located above the design flood elevation __________________
a. under no circumstances.
b. unless approved as a buoyancy compliant system.
c. except when designed to prevent water from entering or accumulating within components.
d. if they contain backwater valves.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

7. l.P.S. is the abbreviation for __________________.
a. iron pipe standard
b. iron pipe size
c. inside pipe standard
d. inside pipe size

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?