Chapter 02 2021 UPC

Chapter 02 2021 UPC

63 Qs

quiz-placeholder

Similar activities

№1 нұсқа талдау 151-200 сұрақтары

№1 нұсқа талдау 151-200 сұрақтары

KG - University

60 Qs

Renaissance '25 Geo/Ls. 33/Vocab

Renaissance '25 Geo/Ls. 33/Vocab

7th Grade - University

60 Qs

Particles of Matter

Particles of Matter

KG - University

62 Qs

Physics-Semester 1 Final

Physics-Semester 1 Final

University

67 Qs

8 сынып 3-бөлім.Ақпаратты электронды кестелерде өңдеу

8 сынып 3-бөлім.Ақпаратты электронды кестелерде өңдеу

KG - University

59 Qs

Duplicate of Duplicate of Revision Periodic Table & Trends (LO1.4) + Electron Configuration (LO1.5)

Duplicate of Duplicate of Revision Periodic Table & Trends (LO1.4) + Electron Configuration (LO1.5)

KG - University

63 Qs

Soal ujian pengelolaan bengkel

Soal ujian pengelolaan bengkel

10th Grade

58 Qs

Med Core 1 Review

Med Core 1 Review

10th Grade - University

60 Qs

Chapter 02 2021 UPC

Chapter 02 2021 UPC

Assessment

Quiz

others

Easy

Created by

Jeremy Sandor

Used 75+ times

FREE Resource

63 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A physical separation that may be a low inlet into the indirect waste receptor from the fixtures, appliances, or devices indirectly connected is the definition for an ______?
a. air break
b. air gap
c. indirect waste
d. individual vent

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image
Select the word or term that fits the sketch.
a. air gap
b. airbrake
c. overflow rim
d. static head

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The organization, office, or individual responsible for enforcing the requirements of a code or standard is the _________________________.
a. administrative authority
b. building department
c. plumbing inspector or department
d. Authority Having Jurisdiction

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Fixture connections that require the removal of an access panel for servicing are considered _______.
a. accessible
b. readily accessible
c. not accessible
d. exposed

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

That part of the lowest piping of a drainage system that receives the discharge from soil, waste, and other drainage pipes inside the walls of the building and conveys it to a point 2 feet outside the building wall is a _____.
a. building drain
b. building sewer
c. waste pipe
d. soil stack

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

That portion of a drainage system that does not drain by gravity into the building sewer is known as a _____.
a. building supply
b. building subdrain
c. sewer ejector
d. storm sewer

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A horizontal drain that is sized to provide free movement of air above the flow line of the drain is called a _____.
a. continuous waste system
b. durham waste and vent system
c. combination waste and vent system
d. solvent waste and vent system

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?