Roman Architecture

Roman Architecture

5th Grade

54 Qs

quiz-placeholder

Similar activities

REVIEW UNIT 10: WE EXPLORE THE MODERN AGE

REVIEW UNIT 10: WE EXPLORE THE MODERN AGE

5th Grade

51 Qs

Praxis 5004

Praxis 5004

3rd Grade - University

51 Qs

50 States Quiz WJH

50 States Quiz WJH

3rd - 12th Grade

50 Qs

World History I 2014 Released SOL

World History I 2014 Released SOL

KG - University

49 Qs

War of the Currents

War of the Currents

KG - University

51 Qs

T4B1 Sejarah Percubaan (KBSM)

T4B1 Sejarah Percubaan (KBSM)

5th Grade

50 Qs

LOL

LOL

4th - 8th Grade

53 Qs

Wilson's Social Studies

Wilson's Social Studies

KG - University

50 Qs

Roman Architecture

Roman Architecture

Assessment

Quiz

History

5th Grade

Practice Problem

Medium

Created by

Deven Biediger

Used 14+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

54 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Building sewers shall be tested by completely filling the sewer with water from the _

lowest to highest point

lowest to at least a 5-foot head

lowest to at least 10-foot head

lowest to at least ground level

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Except for plastic piping systems, hot and cold water piping may be tested with _

40 psi air or 150 psi water for 10 minutes

35 psi air for at least 15 minutes

50 psi air or the working pressure of the water in the system for at least 15 minutes

100 psi air for at least 10 minutes

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The required clearance in front of a 2-inch cleanout is _ inches.

8

12

18

24

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A stack, as defined in the code, is _

the main vent

and vertical vent

the vertical main of soil, waste, or vent piping that extends one or more stories

the horizontal main of soil, waste, or vent stack

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Under no circumstances may gas appliance pressure regulators be vented _

to the atmosphere

to the combustion chamber near the pilot

to the gas utilization equipment flue or exhaust system

using black iron pipe

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Above ground schedule 40 PVC and ABS DWV plastic piping installed horizontally shall be supported intervals of not to exceed _ feet.

4

6

8

10

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When sizing a copper fuel-gas piping system that has an inlet pressure of less than 2 psi with a pressure drop of 0.3-inch w.c., the maximum cubic feet per hour of gas flow allowed through a 5/8-inch OD. ACR tube 75 feet in developed length is_

13

27

48

68

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?