pert cpm

pert cpm

University

36 Qs

quiz-placeholder

Similar activities

Moon Phases Review

Moon Phases Review

KG - University

38 Qs

1 Part - ERP/By @Kazima

1 Part - ERP/By @Kazima

University

37 Qs

Instructional Process:Strategies for Instruction Vocabulary

Instructional Process:Strategies for Instruction Vocabulary

University

34 Qs

Bahasa Inggris Semua jurusan

Bahasa Inggris Semua jurusan

12th Grade - University

40 Qs

INFO 242_Ch1

INFO 242_Ch1

University

40 Qs

Practice Test 2 - Part 2

Practice Test 2 - Part 2

University

35 Qs

Basics

Basics

University

35 Qs

IS Project Management 2 - MakScie - Quiz 1

IS Project Management 2 - MakScie - Quiz 1

University

40 Qs

pert cpm

pert cpm

Assessment

Quiz

Other

University

Hard

Created by

e ew

Used 5+ times

FREE Resource

36 questions

Show all answers

1.

FILL IN THE BLANK QUESTION

1 min • 1 pt

• is a popular project management technique that is applicable

when the time required to finish a project is not certain. • it was devised in 1958 for the POLARIS missile program by the

program evaluation branch of the Special Project office of the

U.S. Navy. • was developed as a result of looking for an improved method of

planning and evaluating progress of large scale research and

development program.

2.

FILL IN THE BLANK QUESTION

1 min • 1 pt

• is a statistical algorithm which has a certain start and end time

for a project

• was designed as a tool for planning, scheduling and control of

construction work. • was developed by J.E. Kelly of the Remington Rand Corp. and

M.R. Walker of Du Pont in an effort by commercial industry to

make an advanced scheduling and cost control methods

3.

FILL IN THE BLANK QUESTION

1 min • 1 pt

defined as determining the relationship between the

work operation and the sequence in which they are to be

performed.

4.

FILL IN THE BLANK QUESTION

1 min • 1 pt

is defined as the process of translating the arrow

diagram into time table of calendar days.

5.

FILL IN THE BLANK QUESTION

1 min • 1 pt

involves collecting and analyzing data

gathered from the project.

6.

FILL IN THE BLANK QUESTION

1 min • 1 pt

Five Inputs that can be obtained in Planning Phase

7.

FILL IN THE BLANK QUESTION

1 min • 1 pt

showing the number and kind of resources, man power, equipment and others

that are required for each day of the project.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?