Phase test 3 revision CT

Phase test 3 revision CT

6th - 8th Grade

21 Qs

quiz-placeholder

Similar activities

Site Safety Revision

Site Safety Revision

4th - 6th Grade

20 Qs

American Revolution and Georgia

American Revolution and Georgia

8th Grade

20 Qs

computer prep 2     n1

computer prep 2 n1

8th Grade

20 Qs

Name The Animal!

Name The Animal!

KG - 6th Grade

20 Qs

QUIZ 1 : TOPIC 8 [JOB ORDER COSTING]

QUIZ 1 : TOPIC 8 [JOB ORDER COSTING]

1st Grade - University

20 Qs

AI Vocabulary

AI Vocabulary

6th - 8th Grade

20 Qs

Big Bang theory/ Milky Way

Big Bang theory/ Milky Way

6th Grade

16 Qs

QUIZ 1 : TOPIC 4 [COST VOLUME PROFIT ANALYSIS]

QUIZ 1 : TOPIC 4 [COST VOLUME PROFIT ANALYSIS]

1st Grade - University

20 Qs

Phase test 3 revision CT

Phase test 3 revision CT

Assessment

Quiz

Education

6th - 8th Grade

Easy

Created by

min Zhen

Used 4+ times

FREE Resource

21 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

which part of scaffolding serves as a working place and support loads?

platform

standard

transom

toe board

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

what is the required height for a toe-board by referring to the standard regulation for working platform?

280mm

180mm

150mm

100mm

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

information required in scaffolding inspection report is:

1. location and description of scaffolding​

2. date of inspection

​ 3. __________

​ 4. result of ​ inspection

5. signature of the person who made the inspection

identification of the inspection

types of the scaffolding

durability of the scaffolding

condition of the scaffolding

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

which statement is the correct definition of PACKING the terms used in describing formwork and falsework?

vertical timber or steel to support formwork

block of wood used to fill a gap and provide support

horizontal timber member designed to carry load

horizontal framework or collar that supporting the column formwork

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

what is the purpose of providing speed restriction ramped and painted across the road?

to encourage vehicle to stop

to encourage vehicle to slow down

to encourage vehicle to go faster

to prevent vehicle enter this areas

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

which one is NOT an example method of road surfacing?

flexible construction

rigid construction

fixed construction

semi-rigid construction

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

which of the term used to described a piece of wood of projection to prevent slipping in the construction of formwork?

bearer

cleat

crosshead

prop

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?