Random Plumbing 02

Random Plumbing 02

Professional Development

40 Qs

quiz-placeholder

Similar activities

Ph1 302 Common processes and techniques checkpoint test

Ph1 302 Common processes and techniques checkpoint test

Professional Development

40 Qs

Cryo Pumps

Cryo Pumps

Professional Development

38 Qs

Vacuum Pumps

Vacuum Pumps

Professional Development

41 Qs

Phase 1 Central Heating checkpoint test

Phase 1 Central Heating checkpoint test

Professional Development

40 Qs

6035 Cold water Quiz 1

6035 Cold water Quiz 1

Professional Development

45 Qs

Plumbing Regulations and Systems Quiz

Plumbing Regulations and Systems Quiz

Professional Development

45 Qs

Common Plumbing Processes C&G 8202 6035

Common Plumbing Processes C&G 8202 6035

Professional Development

43 Qs

Pdpl

Pdpl

Professional Development

35 Qs

Random Plumbing 02

Random Plumbing 02

Assessment

Quiz

Other

Professional Development

Medium

Created by

Johnny Thulin

Used 9+ times

FREE Resource

40 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

When a union is provided for an appliance connected by rigid metallic pipe, the union shall be accessible and located within ___________________feet of the appliance.
2
3
4
6
411.1.6 IFGC

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

A __________ is not required for a sewage sump and ejector.
pump alarm
vent
check valve
full open valve
712.2 and 712.3.2

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

When required to discharge to a combined building sewer system, floor drains in a __________ are not required to be individually trapped.
food preparation facility
multilevel parking garage
warehouse
factory
1002.1, Exception 4

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

An indirect waste pipe that discharges through an air break must terminate above the __________ of the waste receptor.
flood level rim
trap seal
critical level
strainer dome
802.3.2

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Where tests are required as evidence of compliance with the code, the test reports code, the test reports shall be retained for __________. shall be retained for __________. shall be retained for __________.
180 days after completion of the project
the period required for retention of public records
90 days after completion of the project
120 days after occupancy of the building
105.3.3

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

When a plumbing permit is issued, the construction documents shall be stamped __________.
APPROVED FOR CONSTRUCTION
APPROVED
ACCEPTED AS REVIEWED
REVIEWED FOR CODE COMPLIANCE
106.5.1

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Floor drains in walk-in refrigerators of food establishments shall be __________.
directly connected to the drainage system
connected to the drainage system protected with a backwater valve
y connected to the drainage system by means of an air gap
y connected to the drainage system by means of an air break
802.1.2

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?