HAC101 Week 7 Quiz Evaporators

HAC101 Week 7 Quiz Evaporators

Professional Development

20 Qs

quiz-placeholder

Similar activities

Manajemen Risiko

Manajemen Risiko

Professional Development

15 Qs

DTA Kaun Banega QuizPati - Theme: General Knowledge

DTA Kaun Banega QuizPati - Theme: General Knowledge

Professional Development

20 Qs

FA Quizz

FA Quizz

Professional Development

20 Qs

PDEC201 - Concepts of Observation/Assessment in ECCE

PDEC201 - Concepts of Observation/Assessment in ECCE

Professional Development

20 Qs

Ice breaking

Ice breaking

Professional Development

15 Qs

Product Quiz

Product Quiz

Professional Development

15 Qs

CPR_Quiz_Arrays and strings

CPR_Quiz_Arrays and strings

Professional Development

20 Qs

Post Test Basic Modul 3 Jam

Post Test Basic Modul 3 Jam

Professional Development

17 Qs

HAC101 Week 7 Quiz Evaporators

HAC101 Week 7 Quiz Evaporators

Assessment

Quiz

Professional Development

Professional Development

Practice Problem

Medium

Created by

Mark Raybon

Used 38+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

After the refrigerant has been charged into the air-conditioning system, rotate the compressor shaft by hand to push out any _______ that may have entered the compressor during the charge process.

Select one:

Air bubbles

Dust

Debris

Liquid

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Tech A states that verifying the repair is performed by post-testing of the air-conditioning system. Tech B states that an electronic leak detector or fluorescent dye testing is used when the system is discharged. Who is correct?

Select one:

Tech A

Tech B

Both A and B

Neither A nor B

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Technicians must be ________ certified to handle refrigerants.

Select one:

ASE 607

ASE 515

EPA 609

EPA 511

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the minimum amount of time an A/C system should be evacuated for to effectively boil all the water out of the A/C system?

Select one:

10 Minutes

15 Minutes

30 Minutes

45 Minutes

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

________ is the term used to describe the process of making the system perform to its maximum ability and comparing that to specifications.

Select one:

Air-conditioning testing

Performance testing

Evacuation of the system

Post-testing

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The first step in the diagnostic process of the HVAC system is _______.

Select one:

Diagnosing any faults that are causing the system to operate incorrectly

Evacuating the air-conditioning system

Reclaiming the air-conditioning system before any repair or nitrogen testing is required

Carrying out a performance test of the air-conditioning system

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

________ is the process of creating a low pressure or vacuum in the air-conditioning system, using a vacuum pump and gauges.

Select one:

Reclaiming

Evacuation

Charging

Recovering

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?