2018 IPC CH 3B Quiz

2018 IPC CH 3B Quiz

Professional Development

25 Qs

quiz-placeholder

Similar activities

WCD_Khnadwa

WCD_Khnadwa

Professional Development

20 Qs

 BG Chapter 13

BG Chapter 13

Professional Development

20 Qs

Quiz E-Learning Dengan Google Classroom (Quiz 2 CE 4.0)

Quiz E-Learning Dengan Google Classroom (Quiz 2 CE 4.0)

Professional Development

20 Qs

Wawancara dan Mengubah Bentuk Pecahan

Wawancara dan Mengubah Bentuk Pecahan

4th Grade - Professional Development

20 Qs

LÓGICA 2

LÓGICA 2

Professional Development

20 Qs

Mantenimiento básico del motor

Mantenimiento básico del motor

Professional Development

20 Qs

POSTEST RAKOR UNBK SUL-SEL

POSTEST RAKOR UNBK SUL-SEL

University - Professional Development

20 Qs

2018 IPC CH 3B Quiz

2018 IPC CH 3B Quiz

Assessment

Quiz

Other

Professional Development

Hard

Created by

Johnny Thulin

Used 2+ times

FREE Resource

25 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

01. When installed horizontally, 11/4-inch polypropylene pipe and tubing shall be supportedat maximum intervals of __________.
32 inches
48 inches
8 feet
10 feet

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

02. A horizontal 4-inch PVC drainage pipe suspended from the ceiling requires ________ at a 90 degree turn.
axial restraints
sway bracing
coupling restraints
thrust blocks

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

03. 1/2" CPVC water pipe installed horizontally shall be supported at maximum intervals of __________ feet.
6.0
5.0
4.0
3.0

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

04. Support hangers for 10-foot lengths of cast-iron soil pipe suspended from a ceiling shall be spaced not more than __________ feet.
2.5
5.0
7.5
10.0

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

05. PVC pipe installed vertically requires a guide installed midway between required supports for pipe sizes __________ inch(es) and smaller.
1"
3"
2"
1-1/4"

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

06. Which of the following is not specifically allowed for sealing around a pipe that passes through an exterior wall?
flashing
caulk
foam sealant
gasketing system

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

07. When located in a flood hazard area, the top of a potable water well casing without a sealed cover shall extend not less than __________ inches above the design flood elevation.
6.0
12.0
18.0
24.0

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?