1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
This is the shortest possible time in which the activity can be finished. It assumes that everything goes well.
Optimistic
Pessimistic
Most Likely
Accurate
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The longest possible time required to perform an activity under extremely bad conditions
The longest possible time required to perform an activity under extremely bad conditions
Optimistic
Pessimistic
Most Likely
Accurate
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Critical path is the
shortest time path in a network
longest time path in a network
efficient time path in a network
optimal time path in a network
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Activities with zero slack lie on a
Non-Critical path
Critical path
Normal path
Crash path
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A ______ is a graphical representation of arrows and nodes for showing logical sequence of activities performed to achieve a project objectives.
Bar
Network
Chart
Diagram
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
If duration of each activity in a project scheduling is not known with certainty then ____ network model is used
CPM
PERT
PEST
Deterministic
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
________ analysis is used for planning, scheduling and controlling large complex projects.
Transportation
LPP
Network
Assignment
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?