Grades, Part One

Authored by Skyler Venable

Other

12th Grade

Used 67+ times

Grades, Part One
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of analysis should a proposed site's natural features and characteristics be?

job site

preliminary

geographical

topographical

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

the most common manner of setting finish grade stakes is to set them

level with the finished surface

Level with subgrade surface

set distance above the finished surface

set distance above the subgrade surfaces

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

construction site stakes with red, yellow, and orange flagging tied to them are used for marking

special types of grades

underground utilities

proposed construction

special elevation levels

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The term is used for a side view of a proposed project

Profile

Elevation

End view

Lateral scan

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

if the grade of a surface rises 1 foot every 25 feet of horizontal distance, the percentage of the grade change is

1/4%

4%

-4%

40%

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Red-top stakes are used to indicate

the underground sewage utility

the legal boundaries of the construction site

that rough grading work is still needed

the exact finish of the grade

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In most cases how much of the cloth used for a silt fence is buried?

12 in

18 in

24 in

36 in

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?