Search Header Logo

BBS:Friday@4pm with Wan Hassan

Authored by STR JPW

Professional Development

Professional Development

Used 2+ times

BBS:Friday@4pm with Wan Hassan
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Which of the following items in the currency cycle (in correct sequence) involve ACC?

Procurement, Inventory, Distribution, Processing

Distribution, Inventory, Processing, Destruction

Procurement, Distribution, Inventory, Destruction

Inventory, Distribution, Processing, Destruction

2.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Which of the following statement is incorrect in relation to ACC systems?

WMS is Warehouse Management System

CPM is Cash Processing Machine

SBDS is Shredded Banknotes Destruction System

ASRS is Automated Storage and Retrieval System

3.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

During deposit of banknotes from financial institution (FI), who will load the bins on the bin conveyor at loading dock?

ACC Currency Hand

CIT Personnel

FI Cash Officer

ACC Cash Processing Staff

4.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

The deposited bins for the day will be sorted out by _______ before being stored in high-bay.

Weight

Condition

Denomination

FIFO

5.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Which of the following statement is incorrect in relation to gantry robots at ACC?

There are 4 gantry robots in ACC

Gantry robot will use grippers to pick up bins containing banknotes

Gantry robot will only use suction cups to pick up boxes containing banknotes 

There are two types of gantry robots being used at ACC - for bins and for boxes

6.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

In the normal course of issuing operations, the issuing bins will undergo ______ to ensure correct bins/boxes are issued.

RFID profile check  

Visual check

Spot check

Frisking

7.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

CIT personnel normally use ______ to unload issued bins from conveyor at loading dock.

Bare hands

Hand pallet truck

Gantry robot

AGV

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?

Discover more resources for Professional Development