ENG4216

ENG4216

11th Grade - University

30 Qs

quiz-placeholder

Similar activities

EIE Quiz 1

EIE Quiz 1

University

25 Qs

Capacitors, Electromagnetism & Electromagnetic Induction

Capacitors, Electromagnetism & Electromagnetic Induction

12th Grade - University

25 Qs

Exploring Current and Magnetism (20 Quiz II)

Exploring Current and Magnetism (20 Quiz II)

9th - 12th Grade

32 Qs

Circuits, Motors, Generators, and Transformers

Circuits, Motors, Generators, and Transformers

11th - 12th Grade

25 Qs

IGCSE Electromagnetic Effect

IGCSE Electromagnetic Effect

11th Grade

30 Qs

Magnetism

Magnetism

9th - 12th Grade

31 Qs

Magnetism Review

Magnetism Review

9th - 12th Grade

31 Qs

Electromagnetic Induction Class 10

Electromagnetic Induction Class 10

10th - 12th Grade

30 Qs

ENG4216

ENG4216

Assessment

Quiz

Physics

11th Grade - University

Medium

Created by

Dave Alviz

Used 10+ times

FREE Resource

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Lock out / tag out is the procedure.

To keep the machines in lock forever

To put tags with names of machine parts

To carry out maintenance jobs safely

To get permission for maintenance job

2.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

If you see damaged a wire during maintenance job then what action shall you take.

Replace the damaged wire with any wire

Ignore the damage and cover it with other wires

Just put a warning label

Repair it as per the manufacturer standards without reducing the protection

3.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

What preparations must be made before work to handle any emergency?

Locate nearest first aid and firefighting equipment

Locate nearest bathroom

Locate nearest mall

Locate nearest cafeteria

4.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Work permit is a document used to;

Estimate the cost of any maintenance

Take permission to start any maintenance work

Ensure the availability of spare parts needed for maintenance

Describe the skills of the technicians doing maintenance work

5.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

How to get authorization to carry out any maintenance work in industry?

By taking verbal permission

By asking your supervisor on email

By using work permit form

By asking any colleague

6.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

A step up transformer;

Decrease the voltage at output

Keep the voltage same at input and output

Increase the voltage at output

Changes the voltage all the time

7.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Basic construction of transformer contains three parts, which are;

Primary winding, Secondary Winding and Rotor

Rotor, Stator and Winding

Primary winding, Secondary Winding and Iron core

Armature, Shaft and bearings

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?