Quiz 1 - GBS - Dubai - Introduction to construction management

Quiz 1 - GBS - Dubai - Introduction to construction management

University

31 Qs

quiz-placeholder

Similar activities

Kitchen Tools and Equipment

Kitchen Tools and Equipment

University

30 Qs

Lesson 5: Harmonics

Lesson 5: Harmonics

University - Professional Development

32 Qs

Chapter one: Introduction to BRIDGE ENGINEERING

Chapter one: Introduction to BRIDGE ENGINEERING

University

28 Qs

CMT 210 Midterm Study Guide

CMT 210 Midterm Study Guide

University

35 Qs

Engineering Ethics & Integrity (S2, 2025)

Engineering Ethics & Integrity (S2, 2025)

University

27 Qs

PRELIM (CE 11-1)

PRELIM (CE 11-1)

University

32 Qs

Road signs

Road signs

10th Grade - Professional Development

26 Qs

Advanced Project Management Quiz

Advanced Project Management Quiz

University

26 Qs

Quiz 1 - GBS - Dubai - Introduction to construction management

Quiz 1 - GBS - Dubai - Introduction to construction management

Assessment

Quiz

Other

University

Medium

Created by

Riham Fakhouri - GBS Dubai

Used 7+ times

FREE Resource

31 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

2 mins • 5 pts

Media Image

What are the triple constraints of Project Management?

site, cost, and quality

brief, cost and time

time, cost and Scope

time, quality and scope

2.

MULTIPLE CHOICE QUESTION

2 mins • 5 pts

Who deals with construction workers, equipment and materials?

Project Manager

Construction Manager

Project Implementor

All of the above

3.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Media Image

What is a Construction contract?

An exchange of promises between two or more parties to do, or refrain from doing an act, which resulting contract is enforceable in a court of law.

Exchange of money in return for construction material and building services.

Buying from external organizations and 3rd parties to start construction project

A legal agreement document between two parties (client (Owner) & Contractor) that binds the contractor to do the job with the specified requirements and the client to pay for it.

4.

MULTIPLE CHOICE QUESTION

2 mins • 5 pts

 

Which types of Contracts are not used in Construction

Express and Implied Contracts

Unit price Contracts

Time and materials contracts

Lump-sum Contract

5.

MULTIPLE CHOICE QUESTION

2 mins • 5 pts

A Construction Manager is based at the headquarters and job site. True or False?

True

False

6.

MULTIPLE CHOICE QUESTION

2 mins • 5 pts

. In a typical building project, the coordination of the building’s design is done by the

owner

general contractor

building official of the city.

architect

any one of these, depending on the type of building.

7.

MULTIPLE CHOICE QUESTION

2 mins • 5 pts

The construction drawings of a building project are drawings that

the architect uses to explain the design to the owner.

True

False

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?