CMA 385 - Estimating I Chapters 1-3

CMA 385 - Estimating I Chapters 1-3

University

84 Qs

quiz-placeholder

Similar activities

Direction control valves

Direction control valves

University

85 Qs

MT CH 10

MT CH 10

University

80 Qs

FUN - U2 - L3

FUN - U2 - L3

University

79 Qs

Literary Terms and Plot Questions

Literary Terms and Plot Questions

7th Grade - University

79 Qs

cerebrovascular: disease

cerebrovascular: disease

University

79 Qs

MSTE Terminologies

MSTE Terminologies

University

84 Qs

Water Supply and Construction Quiz

Water Supply and Construction Quiz

University

88 Qs

Midterms O&M (BME 311)

Midterms O&M (BME 311)

University

80 Qs

CMA 385 - Estimating I Chapters 1-3

CMA 385 - Estimating I Chapters 1-3

Assessment

Quiz

Other

University

Medium

Created by

Jeremiah Arnett

Used 185+ times

FREE Resource

84 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 3 pts

___ estimates are prepared as the design process proceeds towards completion.

Rough

Interim

Preliminary

Simple

2.

MULTIPLE CHOICE QUESTION

30 sec • 3 pts

The levels of ___ estimates include detail takeoff and crew-based estimates.

final

closing

concluding

finished

3.

MULTIPLE CHOICE QUESTION

30 sec • 3 pts

The ___ used depend on company practice, the project being estimated, and/or estimator preference.

pricing parameters

costing calculations

financial prodedures

estimating practices

4.

MULTIPLE CHOICE QUESTION

30 sec • 3 pts

___ estimates are used to develop various basic project budgets based on a variety of project options and require the least amount of construction documentation to complete.

Coneptual

Order of magnitude

Detail takeoff

Construction document

5.

MULTIPLE CHOICE QUESTION

30 sec • 3 pts

___ estimates, also referred to as schematic or model estimates, are based on the building function or the functional area of the building.

Design development

Conceptual

Detail takeoff

Construction document

6.

MULTIPLE CHOICE QUESTION

30 sec • 3 pts

___ estimates require completion of the majority of the construction documents and confirm the overall project costs as the design nears completion.

Construction document

Detail takeoff

Order of magnitude

Design development

7.

MULTIPLE CHOICE QUESTION

30 sec • 3 pts

At the ___ estimate level, owners commonly compare the costs determined at this level of estimating with bids received from various contractors and subcontractors.

construction document

detail takeoff

design development

crew-based

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?